FIGURE 6: Temperature Sensor and Remote Panel Installation
Without the temperature sensor installed the output of the charger will be at the nominal
voltages specified in the chart below at 72° F (22.2° C). The absorption/float output voltage
settings at that temperature are listed in the chart.
To provide some examples which clarify the effect of the temperature compensation sensor,
the chart lists the absorption/float output voltages of the charger when batteries are at 72° F
(or when the sensor is not installed), and at cold (50° F) or hot (90° F) battery temperatures
with the sensor installed:
Temperature Compensation Chart
Battery
Temperature
° F
° C
Gel-Cell Lead Acid Gel-Cell Lead Acid Gel-Cell Lead Acid Gel-Cell Lead-Acid
50
10
14.4
72
22.2
14.0*
90
32.2
13.7
* Factory pre-set voltages without temperature compensation option installed
F) Equalize Timer Option
Some manufacturers of flooded lead-acid batteries recommend a charging process known as
equalization for extended battery life. This process involves occasionally charging a wet lead-
acid battery at a very high voltage for a short period of time in order to completely de-
sulphate each of the battery plates, essentially equalizing their voltage. The installer of the
Phase Three charger may choose to wire in this option at the time of installation.
U.S.A. HEADQUARTERS
P.O. Box 1306, Newport Beach, CA 92663
Phone: 714-751-0488 Fax: 714-957-1621
E-Mail: sales@newmarpower.com
Output V d.c : 12 Volt Models
Charge
Float
14.6
14.0
13.8
14.2*
13.6*
13.4*
13.9
13.3
13.1
E
LECTRONIC
C
OMMUNICATION
www.newmarpower.com
Note: This diagram does not
illustrate a complete system.
Refer to ABYC Standards E-8;
AC Electrical Systems on Boats,
E-9; DC Electrical Systems
on Boats
Output V d.c : 24 Volt Models
Charge
Float
28.8
29.2
28.0
28.0*
28.4*
27.2*
27.4
27.8
26.6
P
P
OWER
RODUCTS
! ! ! ! !
N
AVIGATION
27.6
26.8*
26.2
EURO WAREHOUSE
Phone:+31-35-603-2494
Fax:+31-35-603-2149
15