Section 3 Installation Procedure; Lifting And Transport; Unpacking; Positioning - NUVE TK 120 User Manual

Climatic test cabinets
Table of Contents

Advertisement

3. SECTION
INSTALLATION PROCEDURE

3.1. Lifting and Transport

All lifting and transport must be carried out by using proper handling equipment. The
equipment must be supported from underneath and never be turned over.

3.2. Unpacking

Remove the packing box and the second nylon packing around the instrument. The below
written items are provided with the equipment, please check them;
 User's Manual
 2 shelves (standard)
 4 shelf carriers
 Warranty Certificate
 Funnel
 60 cm. waste water hose

3.3. Positioning

Check that,
 No damage has occurred during transport.
 The proposed site is suitable for users.
 The operator can follow up the test cabinet easily.
 The test cabinet does not occupy the utilization space of other instruments or does not
damage them.
 There is enough space from the cooling unit ventilation. Leave at least 30 cm (50 cm.
recommended) on the back side of the instrument.
ATTENTION!!!
Please pay special attention to the followings,
Indoor use only
Room temperature from 5°C to 30°C
The maximum performance is obtained at the temperature of 22ºC and humidity rate of
80%.
Maximum altitude 2000 m.
 Please make sure that the supplied mains match the required power ratings.
 Always plug the instrument to correctly grounded sockets.
 The height of waste water outlet from ground should not exceed 15 cm.
A supply fitted with a circuit breaker should be used for protection against indirect
contact in case of an insulation fault.
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tk 252Tk 600

Table of Contents