Dolomite fluidic factory Quick Start Manual

Dolomite fluidic factory Quick Start Manual

Hide thumbs Also See for fluidic factory:

Advertisement

QUICK- S TA RT GUIDE
1
Before setting up, ensure you have all
the correct components:
Print Head, Gearbox, Print Bed, Print Bed
Insert, CoC Reel with NozzleTweezers,
Digital calipers, USB stick, Glass block
3
2
Ensure the Fluidic Factory is
placed in a vibration and draft free
environment.
Plug in the power cable on the back of
Fluidic Factory and switch rear power on.
Now switch on Fluidic Factory from
power switch located at the front and
follow the on-screen instructions.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the fluidic factory and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Dolomite fluidic factory

  • Page 1 • Plug in the power cable on the back of Fluidic Factory and switch rear power on. • Now switch on Fluidic Factory from power switch located at the front and follow the on-screen instructions.
  • Page 2 Inserting the Print Bed • Ensure the Fluidic Factory surface and bottom of Print Bed is free from dust and debris. • Put the Print Bed in contact with the pins then lever it down as shown. • Check the Print Bed is in the correct position.
  • Page 3 Slide the Print Bed Insert in and lower it down. Inserting the CoC Reel • Insert the CoC reel as shown. Ensure that the guide tube is securely fitted and CoC is not trapped between Reel Holder. www.dolomite-microfluidics.com SUPPORT support@dolomite-microfluidics.com...
  • Page 4 Inserting the Nozzle • Push the lever back and feed the nozzle through the Print Head. • Ensure the nozzle has been pushed down to the bottom as shown. • Connecting the Gearbox Locate the gearbox onto the drive pin and rotate around towards the nozzle.

Table of Contents