Connection Requirements; Loading Trolley Assembly On Rail - Harken R27 Instruction Manual

Industrial access rail
Hide thumbs Also See for R27:
Table of Contents

Advertisement

Additional option
Add an optional IN9565, IN9565.CLEAR
IN10614, IN10614.CLEAR pinstop
trolley or IN9608, IN9608.CLEAR
IN9608, IN9608.CLEAR trolley with
coupler to work as your tool service carrier

Connection requirements

When using a hook with positive locking mechanism to connect to trolley shackle, ensure roll-out cannot
occur. Roll-out occurs when interference between hook and mating connector causes hook gate to
unintentionally open and release.
Use self-locking snap hooks and carabiners to reduce possibility of roll-out. Hooks or connectors must
completely close over attachment object.
Do not attach a connector that will impact the side of the trolley when in use.

Loading trolley assembly on rail

WARNING!
Carefully align trolley assembly with rail and gently roll into place. If balls are lost, trolley
assembly must not be used. Trolley with missing balls may come off rail resulting in a fall, severe
injury or death. Contact an official Harken R27 Trolley inspector or the nearest official Harken
Service Center to restore the correct functionality of the product.
When removing the trolley from the rail, use the foam ball keeper sent with the original packaging to avoid
losing balls bearings.
Foam ball
keeper
12
1 - Fall arrest trolley
2 - Working trolley
3 - Tool service trolley
1
ENGLISH
2
3
13/11/19

Advertisement

Table of Contents
loading

Table of Contents