Monthly Maintenance - ALLAN'S Ecomax Auto-Stoker Installation And Operating Manual

Coal boiler
Table of Contents

Advertisement

• Open and close the Ash
Valve by forcefully pushing
The Ash Valve Lever in and
out. This will allow any fines
and ash under the Burn Pot
to drop into the Ash Pan.
Ensure the Ash Valve is
Fully closed afterwards
Otherwise the boiler will not
be able to operate effectively.
• Clear the Burn Pot air ports
of any clinker or stones.
Make sure all the air ports
are completely clear to ensure
efficient combustion.
• Empty the Ash Pan (or after
20 hours burning). Ensure
the Ash Pan seals with the
bottom of the Combustion
Chamber when replacing.
Dispose of ashes safely once
cooled.

Monthly Maintenance

• Disconnect the Smoke Back
Tube from the top of the
Coal Feed Screw Pipe and
check it is completely clear
of fines.
F:\C - E\ECOMAX\COAL BOILER\Instructions and Manuals\Coal Boiler Manual Rev 6.doc
Page 24 of 36
Forceful in and
out movement
with blower
going and ash
pan in place
Use the
supplied poker
to clear all the
air ports around
the Burn Pot
Pull lever to
drop Ash Pan
from bottom of
Combustion
Chamber
Check Smoke
Back Tube is
clear

Advertisement

Table of Contents
loading

Table of Contents