Download Print this page

Cedarshed Montrose Shingle Roof Instructions Manual

Base size: 3000mm x 2490mm deep

Advertisement

Quick Links

CEDARSHED INSTRUCTIONS
MONTROSE- SHINGLE ROOF
Base size: 3000mm x 2490mm deep

Advertisement

loading

Summary of Contents for Cedarshed Montrose Shingle Roof

  • Page 1 CEDARSHED INSTRUCTIONS MONTROSE- SHINGLE ROOF Base size: 3000mm x 2490mm deep...
  • Page 2 MONTROSE  Battery Drill Tools Required:  Riveter  Hammer  Tape Measure  Ladder  Skillsaw  Level  Screwdriver - Flat  3/8 Hex Drive bit  Drill Bit 3.2mm  Read all instructions carefully. Before you start: ...
  • Page 3 MONTROSE PARTS LIST Description Size PACK ONE - ROOF Shingle Roof Panels (L/H) 1550 x 1425 Shingle Roof Panels (R/H) 1550 x 1425 PACK TWO - SHED Standard Door 895 x 1780 Std Wall Panels 900 x 1937 Std Wall Panels 1200 x 1937 End Wall Panels (L/H) 1200 x 2460...
  • Page 4 MONTROSE FLOOR - OPTIONAL Step 1: Lay out floor joists, spacing them evenly as shown. Using 50mm flooring nails, nail a floor board on each end, ensuring ends are flush with joists. Make sure floor is level and joists are sup- ported at 900mm centres.
  • Page 5 MONTROSE CONCRETE FLOOR - OPTIONAL Building a Raised Concrete Base Step 1: Establish size of shed and excavate sufficient area. Remember to allow for rear roof overhang up to 150mm, and 120mm on each end. Step 2: Ensure that the base substrate is compacted firmly. We suggest that the slab should be 80mm thick in the middle and 100mm thick around the edges.
  • Page 6 MONTROSE WALL PLAN 1200 1200L 1200R MONTROSE WALL PLAN 1200L 1200R 1200 15 x 17mm Std Cedar bead 30 x 17mm Std Cedar bead 30 x 17mm Gable Cedar bead Corner Clashing 45 x 20mm Packer PG 5...
  • Page 7 MONTROSE WALLS Step 5: Screw wall panels together using 75mm tek screws (3 per standard join, 4 per gable join), ensuring end wall panels are inside side wall pan- els as per wall plan. Step 6: Silicone edge of weatherboards on stand- ing panel and nail on cedar beads with 5 x bead nails.
  • Page 8 MONTROSE TOP LINTEL Step 8: Using 4 x 75mm tek screws screw door lintel to studs. Ensure outside cedar weather- board on lintel is flush with weatherboards each side. Door Lintel shown from inside Door Lintel shown from outside. MONTROSE TOP STIFFENER Step 9: Using 75mm framing nails, nail both top plate stiffeners into standard wall panels studs, as shown using 2 nails per stud (1 nail per stud at...
  • Page 9 MONTROSE CORNER CLASHINGS Step 11: Silicone and nail 15 x 17mm beads on all corners as shown using 5 x 50mm bead nails, per bead. Step 12: Silicone and nail corner clashings on all corners as shown using 5 x bead nails per clash- ing.
  • Page 10 MONTROSE ROOF Step 16: Using 4 x 75mm Tek screws, screw roof panels together through rafters as shown. (2 screws per rafter) Step 17: Using 12 x 75mm framing nails, nail roof rafters to front and back top plate stiffeners. Predrill if necessary. Step 18: Using 6 x 75mm tek screws , screw 3x collar ties to underside of rafters.
  • Page 11 MONTROSE ROOF Step 21: Slide roof soakers in position on all joints, starting at the bottom row of shingles and working up. Step 22: Nail using 50mm nails, above the bottom of the next row of shingles. Step 23: Remove temporary timber spacer between front and back walls.
  • Page 12 MONTROSE DOOR Step 25: Fit Door Stop in door way. Check all wall panels are straight and panels either side of doorway are tight against door stop. Screw pan- els to floor using 1 x 75mm tek screw per panel. Screw near the panel joins, where possible.
  • Page 13 MONTROSE Your shed is now complete. You may protect Cedar by staining cedar weatherboards if required. PG 12...
  • Page 14: Warranty Registration

    CEDAR SHED WARRANTY GUARANTEE TO CUSTOMER Congratulations on purchasing a quality New Zealand made Cedar Shed manufactured by Riverlea Group Limited. With proper care and attention this product will offer you many years of use. WARRANTY ON METAL CLADDING Your new shed is guaranteed for the benefit of the original purchaser, against defective material or faulty workmanship for fifteen years from date of purchase.