  • Page 1 B83DD Issue 01 1-Nov-21...
  • Page 2: Tools You Need

    Assembly of building will require the use of power tools and a ladder. Please take precautions at all times. Obtaining necessary permits is the sole responsibilty of the purchaser. Please visit our website at www.cedarshed.com for additional safety tips and other considerations to promote safe and enjoyable usage of your Cedarshed Product for years to come.
  • Page 3 Safety Points and Other Considerations As a proud owner of a Cedarshed gazebo, garden shed or outdoor furnishing(s), we want you to safely enjoy it for many years to come. Our products are built for use based on proper installation on level ground and normal residential use.
  • Page 4 Bottom Skirting Middle Skirting Bottom Skirting Top Door Trim Skirting Top Plate Wall Header Header Door Middle Skirting (2ea) 2x3x65½" Cedarshed Plaque Wall Panel Door Frame with Trim Top Plates Skirting Wall Header Skirting Trim 1 x 2 x 87 "...
  • Page 5: Front View

    B83DD Your Cedarshed Product is constructed of Western Red Cedar Exterior. Wall and Roof framing is 2 x 3 SPF, Floor is 2 x 4 Cedar with " plywood. FRONT VIEW SIDE VIEW Measurements for Bayside B83 Area 23.5 Sq. Ft.
  • Page 6: Door Hardware

    B83DD Door Handle Cedarshed Plaque Barrel Bolt Hasp FASTENERS " 2" 3" Nails Screws Screws Part Number Description Size or Type # of Pcs. ACCESSORIES P-H-PLAQL Cedershed plaque P-H-MFLASS Metal roof flashing 3" x 12" FASTENERS P-H-SC2 2" Screws P-H-SC3 3"...
  • Page 7 Typically a slab 3"-4" thick laid over a subbase of 4" of gravel or crushed rock is sufficient but may vary (consult your local Cedarshed supplier). Either mix your own concrete or have it delivered to your site. A 10' x 10' x 4" slab will require approximately 1 cubic yard of concrete.
  • Page 8: Foundation Plan

    B83DD Concrete Patio Stone Foundation (Option 1) (12" x 12" [305 x 305]) Floor Joist System Concrete Slab Foundation (Option 2) Place 1 Concrete (34-1/2" x 98" [978 x 2,490]) Patio Stone Under Floor Joist System under Door Post Foundation Plan [Metric Dimensions shown in brackets]...
  • Page 9 B83DD Lay the joist parts out as per Fig P-11-1 Using 2 - 3" screws per joist. Assembly the joist box together as per Fig P-11-2 The completed joist box is pictured in Fig. P11-3. " x 72" Joist Box - P11 P-2434G P-2469 FIG.
  • Page 10 B83DD Lay the joist parts out as per Fig P-12-1. Using 2 - 3" screws per joist. Assembly the joist box together as per Fig P12-2. The completed joist box is pictured in Fig. P12-3. " x 26" Joist Box - P12 P-2434G FIG.
  • Page 11 B83DD Attach P11 and P12 joist boxes together using 6 - 3" screws. Please refer to figure F-1 and F-2. FIG. F-1 FIG. F-2 Affix the plywood panels as per Fig. F-3 using 2" screws on 12" centers and affixing the plywood to each row of joist.
  • Page 12 B83DD Layout all wall and door panels flat on the ground around the completed floor system as shown (FIGURE S1). Attach 2" x 3" Wall Headers to the 4 solid wall panels that do not have one with 3 - 3" screws as shown (FIGURE S2). Starting from a rear corner, raise and attach an end wall panel to the floor with 3 - 3"...
  • Page 13 B83DD Continue installing all panels except for the door panel using 5 - 3" screws to attach each of the panels together and 3 - 3" screws to attach to the floor. 5 - 3" screws 5 - 3" screws alternating from both sides 3 - 3"...
  • Page 14: Outside View

    B83DD Before installing the door panel, the hinges need to be mounted. Make sure there is an " [3mm] gap at the top of the door, middle, and of the non hinge vertical edge of the door. See Figure 8 below for details. These gaps will allow the door to open freely.
  • Page 15 B83DD When all the Door and Wall Panels are standing, you will now attach the 2" x 3" Top Plates (FIGURE S10 & FIGURE S11) When all the Walls and Top Plates are in place, you will now attach the two Roof Gables and the two Infill Walls with 3"...
  • Page 16 B83DD Slide first roof panel into place. Use 3 -3" screws to attach to gable wall. Slide next roof panel into place,using 3 - 3" screws attach to opposite gable wall and an additional 3 - 3" screws to attach to adjoining roof panel.
  • Page 17 B83DD When complete, take the Metal Flashing Shingles and slide them one by one between the rows of Cedar Shingles along the Roof Panels Joints (FIGURE S15) Slide Metal Flashing under each row of cedar shingles up the full length of the Roof Joint Seam. FIGURE S16 Issue 01 1-Nov-21...
  • Page 18 B83DD Trim Board Installation Shown here is a cross-section diagram showing how the soffits and fascia would appear after they have been applied. All trim is minor bundled for easy identification. ALL TRIM BOARDS SHOULD BE APPLIED WITH THE ROUGH (OR WHAT IS NORMALLY REFERRED TO AS THE RESAWN FACE) FACE EXPOSED.
  • Page 19 B83DD Gable panel Pry the last horizontal bevel siding piece on the Bevel siding bottom of the gable panel slightly. Do not use too much force or the bevel siding will break. Wall panel Gable panel Slide in the skirting, behind the bevel siding as shown on diagram B Skirting Wall panel...
  • Page 20 B83DD There are three pieces of soffit to be attached on the low wide side of the shed. Using 2 - 1 " nails for each end of the soffit and 1 - 1 " nail for the center of each soffit attach the soffit to the underside of the rafter ends. For details refer to Figure S20 below. 2 pieces of x 4 x 37"...
  • Page 21 B83DD Install all Exterior Trim, Corner Boards, Top and Bottom Skirting, Cedarshed Plaque, Soffit Boards, Fascia etc. with 1-3/4" finish nails at 12" centers (FIGURE 17 and FIGURE 18). 1/2 x 2 1/2 x 45" Skirting 1/2 x 3 x 45"...
  • Page 22 B83DD Installing the 8 pieces of fascia. Use 2 - 1 " nails to affix each end of the fascia boards and 1 - " nail to affix the middle of the fascia boards to the rafter ends. 1 x 4 x 42" Fascia P-1442 1 x 4 x 55"...
  • Page 23 B83DD Pre-drill the holes before mounting the handles and hasp using " drill bit. Handle P-H-DHAND Barrel bolt P-H-BBL4 Hasp P-H-HASP (Not exactly as shown) OUTSIDE VIEW FIGURE S22 Issue 01 1-Nov-21...
  • Page 24 B83DD • Attach plaque with finishing nails. Rectangle shape plaques is attached to front fascia. See Figure S24. Cedarshed 2 - finishing plaque nails H-PLAQL Front fascia FIGURE S24...
  • Page 25 CONGRATULATIONS You have just successfully completed the construction of your Cedarshed Building. Thank you for choosing a Cedarshed Product. We hope that your entire experience was a rewarding one and that you will have years of enjoyment with our product.