Issue 01 1-Jan-22
Cedarshed Industries
'The 12ft x 4ft Bayside'
B124DD

Advertisement

Table of Contents
loading

Summary of Contents for Cedarshed Bayside B124DD

  • Page 1 When exposed to the elements, natural unfinished Western Red Cedar will weather to a beautiful silvery grey. If you prefer to maintain the natural wood colors, ask your Authorized Cedarshed Dealer to recommend a quality stain to apply after assembly. Issue 01 1-Jan-22...
  • Page 2: Tools You Need

    Assembly of building will require the use of power tools and a ladder. Please take precautions at all times. Obtaining necessary permits is the sole responsibilty of the purchaser. Please visit our website at www.cedarshed.com for additional safety tips and other considerations to promote safe and enjoyable usage of your Cedarshed Product for years to come.
  • Page 3 Safety Points and Other Considerations As a proud owner of a Cedarshed gazebo, garden shed or outdoor furnishing(s), we want you to safely enjoy it for many years to come. Our products are built for use based on proper installation on level ground and normal residential use.
  • Page 4 P-B-G412C Fascia P-B-G612C Skirting P-1445Yg Fascia P-B-G645 Top Skirting P-1442 Bttm Skirting P-B-G645 P-B-G645 Fascia P-1424 Skirting Fascia Cedarshed P-B-G645 P-1446G Plaque Trim P-H-PLAQL P-1280G Fascia P-1442 Trim P-13C79C Trim P-1280G Trim P-1280G Trim P-11K79C Floor System Trim P-13C79C WWW.CEDARSHED.COM...
  • Page 5: Front View

    Specifications for 'The 12 x 4 Bayside' B124DD Your Cedarshed Product is constructed of Western Red Cedar Exterior. Wall and Roof framing is 2 x 3 SPF, Floor is 2 x 4 Cedar with " plywood. FRONT VIEW SIDE VIEW...
  • Page 6: Accessories And Hardware

    ACCESSORIES AND HARDWARE B124DD Cedarshed Plaque Metal Roof Flashing Window Shutters Flower Box Doors Hasp Door Handle Door Hinge Barrel Bolt " 2" 3" Nails Screws Screws Door Stops Part Number Description Size or Type # of Pcs. ACCESSORIES P-H-PLAQL...
  • Page 7 Typically a slab 3"-4" thick laid over a subbase of 4" of gravel or crushed rock is sufficient but may vary (consult your local Cedarshed supplier). Either mix your own concrete or have it delivered to your site. A 10' x 10' x 4" slab will require approximately 1 cubic yard of concrete.
  • Page 8: Foundation Preparation

    B124DD Foundation Preparation Floor Joist System Concrete Patio Stone Foundation (Option 1) (12" x 12" [305 x 305]) Place 1ea Concrete Patio Stone under Door Post Concrete Slab Foundation (Option 2) (46-1/2" x 144-1/2" [1181 x 3670]) Under Floor Joist System Foundation Plan [Metric Dimensions shown in brackets]...
  • Page 9 B124DD Floor Assembly Joist Box Assembly Lay the joist parts out as per Fig P-9-1 Using 2 - 3" screws per joist. Assembly the joist box together as per Fig P-9-2 The completed joist box is pictured in Fig. P9-3. 46 1/2"...
  • Page 10 B124DD Floor Assembly Joist Box Assembly Lay the joist parts out as per Fig P-10-1 Using 2 - 3" screws per joist. Assembly the joist box together as per Fig P-10-2 The completed joist box is pictured in Fig. P10-3. 46 1/2"...
  • Page 11 B124DD Floor Assembly Joist Box Assembly Lay the joist parts out as per Fig P-11-1 Using 2 - 3" screws per joist. Assembly the joist box together as per Fig P-11-2 The completed joist box is pictured in Fig. P11-3. 72"...
  • Page 12 B124DD Floor Assembly Joist Box Assembly Attach P9,P10 and P11 joist boxes together using 12 - 3" screws. Please refer to figure F-1 and F-2. FIG. F-1 FIG. F-2 Affix the plywood panels as per Fig. F-3 using 2" screws on 12" centers and affixing the plywood to each row of joist.
  • Page 13: Wall Assembly

    B124DD Wall Assembly Layout all wall and door panels flat on the ground around the completed floor system as shown (FIGURE S1). Attach 2" x 3" Wall Headers to the 6 solid wall panels that do not have one with 3 - 3" screws as shown (FIGURE S2). Starting from a rear corner, raise and attach an end wall panel to the floor with 3 - 3"...
  • Page 14 B124DD Wall Assembly Continue installing all panels except for the door panel using 5 - 3" screws to attach each of the panels together and 3 - 3" screws to attach to the floor. 5 - 3" screws 5 - 3" screws alternating from both sides 3 - 3"...
  • Page 15 B124DD Door Hinge Installation Before installing the door panel, the hinges need to be mounted. Make sure there is an " [3mm] gap at the top of the door, middle, and of the non hinge vertical edge of the door. See Figure 8 below for details. These gaps will allow the door to open freely.
  • Page 16 B124DD Top Plate & Infill Walls When all the Door and Wall Panels are standing, you will now attach the 2" x 3" Top Plates (FIGURE S9 & FIGURE S10) When all the Walls and Top Plates are in place, you will now attach the two Roof Gables and the two Infill Walls with 3"...
  • Page 17: Roof Assembly

    B124DD Roof Assembly Slide first roof panel into place. Use 3 -3" screws to attach to gable wall. Slide next roof panel into place,using 3 - 3" screws attach to opposite gable wall and an additional 3 - 3" screws to attach to adjoining roof panel. NOTE: The end gable fascia boards indicates the left and right of each roof panel.
  • Page 18 B124DD Roof Flashing Installation When complete, take the Metal Flashing Shingles and slide them one by one between the rows of Cedar Shingles along the Roof Panels Joints (FIGURE S15) Slide Metal Flashing under each row of cedar shingles up the full length of the Roof Joint Seam.
  • Page 19 Trim Board Installation B124DD Slide first roof panel into place. Use 3 -3" screws to attach to gable wall. Shown here is a cross-section diagram showing how the soffits and fascia would appear after they have been applied. All trim is minor bundled for easy identification. ALL TRIM BOARDS SHOULD BE APPLIED WITH THE ROUGH (OR WHAT IS NORMALLY REFERRED TO AS THE RESAWN FACE) FACE EXPOSED.
  • Page 20 B124DD Installing the Top Skirting at Gable and High Wall Panels Gable panel Pry the last horizontal bevel siding piece on the Bevel siding bottom of the gable panel slightly. Do not use too much force or the bevel siding will break. Wall panel Gable panel Slide in the skirting, behind the bevel siding as shown on...
  • Page 21 B124DD Soffits There are three pieces of soffit to be attached on the low wide side of the shed. Using 2 - 1 " nails for each end of the soffit and 1 - 1 " nail for the center of each soffit attach the soffit to the underside of the rafter ends. For details refer to Figure S20 below. P-G437 P-G424 P-B-G446G...
  • Page 22 B124DD Top and Bottom Skirting Install all Exterior Trim, Corner Boards, Top and Bottom Skirting, Cedarshed Plaque, Soffit Boards, Fascia etc. with 1-3/4" finish nails at 12" centers (FIGURE 17 and FIGURE 18). P-B-G445 P-B-G645 P-B-G645 FIGURE S18 P-B-G412C P-B-G412C...
  • Page 23 B124DD Trim - Fascia Installing the 8 pieces of fascia. Use 2 - 1 " nails to affix each end of the fascia boards and 1 - " nail to affix the middle of the fascia boards to the rafter ends. P-1442 Fascia P-1446G...
  • Page 24 B124DD Door Hardware Installation Pre-drill the holes before mounting the handles and hasp using " drill bit. DR-001 Double Door (Hinges attached) P-H-DHAND Handle P-H-BBL4 Barrel Bolt P-H-HASP Hasp (Not exactly as shown) OUTSIDE VIEW FIGURE S22 Issue 01 1-Jan-22...
  • Page 25 B124DD Flower Box, Shutters, Door Stops Installing the flower box and shutters, use 3" screws to affix to the window panel. FIGURE S23 Issue 01 1-Jan-22...
  • Page 26 B124DD Cedarshed Industries Plaque Installation • Attach plaque with finishing nails. Rectangle shape plaques is attached to front fascia. See Figure S24. H-PLAQL 2 - finishing Cedarshed nails plaque Front fascia FIGURE S24...
  • Page 27 CONGRATULATIONS You have just successfully completed the construction of your Cedarshed Building. Thank you for choosing a Cedarshed Product. We hope that your entire experience was a rewarding one and that you will have years of enjoyment with our product.

Table of Contents