  • Page 1 B84DD...
  • Page 2: Tools You Need

    Assembly of building will require the use of power tools and a ladder. Please take precautions at all times. Obtaining necessary permits is the sole responsibilty of the purchaser. Please visit our website at www.cedarshed.com for additional safety tips and other considerations to promote safe and enjoyable usage of your Cedarshed Product for years to come.
  • Page 3 Safety Points and Other Considerations As a proud owner of a Cedarshed gazebo, garden shed or outdoor furnishing(s), we want you to safely enjoy it for many years to come. Our products are built for use based on proper installation on level ground and normal residential use.
  • Page 4 Wall Headers Wall Header Wall Panel Wall Panels Bottom Skirting Bottom Skirting Middle Skirting Wall Header Skirting Top Plate Header Cedarshed Door (2ea) 2x3x65½" Plaque Wall Panel Door Frame Top Plates with Trim Skirting Wall Header Skirting 1" x 2" x 89½" Trim...
  • Page 5: Front View

    B84DD Your Cedarshed Product is constructed of Western Red Cedar Exterior. Wall and Roof framing is 2 x 3 SPF, Floor is 2 x 4 Cedar with " plywood. FRONT VIEW SIDE VIEW Measurements for Bayside B84 Area 31.5 Sq. Ft.
  • Page 6: Door Hardware

    B84DD Door Handle Cedarshed Plaque Barrel Bolt Hasp FASTENERS " " 2" 2" 3" Nails Nails Nails Screws Screws Part Number Description Size or Type # of Pcs. ACCESSORIES P-H-PLAQL Cedershed plaque P-H-MFLASS Metal roof flashing 3" x 12" FASTENERS P-H-SC2 2"...
  • Page 7 Typically a slab 3"-4" thick laid over a subbase of 4" of gravel or crushed rock is sufficient but may vary (consult your local Cedarshed supplier). Either mix your own concrete or have it delivered to your site. A 10' x 10' x 4" slab will require approximately 1 cubic yard of concrete.
  • Page 8: Foundation Plan

    B84DD Concrete Patio Stone Foundation (Option 1) (12" x 12" [305 x 305]) Floor Joist System Concrete Slab Foundation (Option 2) (46-1/2" x 98-3/16") Under Floor Joist System Place 1 Concrete Patio Stone under Door Post Foundation Plan [Metric Dimensions shown in brackets]...
  • Page 9 B84DD Lay the joist parts out as per Fig P-11-1 Using 2 - 3" screws per joist. Assembly the joist box together as per Fig P-11-2 The completed joist box is pictured in Fig. P11-3. " x 72" Joist Box - P11 FIG.
  • Page 10 B84DD Lay the joist parts out as per Fig P-12-1 using 2 - 3" screws per joist. Assembly the joist box together as per Fig P-12-2. The completed joist box is pictured in Fig. P12-3. " x 26" Joist Box - P12 FIG.
  • Page 11 B84DD Attach P11 and P12 joist boxes together using 6 - 3" screws. Please refer to figure F-1 and F-2. FIG. F-1 FIG. F-2 Affix the plywood panels as per Fig. F-3 using 2" screws on 12" centers and affixing the plywood to each row of joist.
  • Page 12 B84DD Before beginning to mount the wall panels onto the floor, a decision has to be made as to the location of the door and window. Once these are determined then we can proceed with mounting the wall in there desired positions. For our instruction example we have chosen to have the window and door located on the wide (8 ft [2.4m] low wall side.
  • Page 13 B84DD Continuing installing all panels except for the door panel, in desired positions using 5 - 3" screws to attach each of the panels together and 3 - 3" screws to attach to the floor. 5 - 3" screws alternating 5 - 3"...
  • Page 14: Outside View

    B84DD Before installing the door panel, the hinges need to be mounted. Make sure there is an " [3mm] gap at the top of the door, middle, and of the non hinge vertical edge of the door. See Figure 8 below for details. These gaps will allow the door to open freely.
  • Page 15 B84DD When all the Door and Wall Panels are standing, you will now attach the 2" x 3" Top Plates (FIGURE S10 & FIGURE S11) When all the Walls and Top Plates are in place, you will now attach the two Roof Gables and the two Infill Walls with 3" screws (FIGURE S12 and FIGURE S13).
  • Page 16 B84DD Slide first roof panel into place. Use 3 -3" screws to attach to gable wall. Slide next roof panel into place,using 3 - 3" screws attach to opposite gable wall and an additional 3 - 3" screws to attach to adjoining roof panel.
  • Page 17 B84DD When complete, take the Metal Flashing Shingles and slide them one by one between the rows of Cedar Shingles along the Roof Panels Joints (FIGURE S15) Slide Metal Flashing under each row of cedar shingles up the full length of the Roof Joint Seam. FIGURE S16...
  • Page 18 B84DD Trim Board Installation Shown here is a cross-section diagram showing how the soffits and fascia would appear after they have been applied. All trim is minor bundled for easy identification. ALL TRIM BOARDS SHOULD BE APPLIED WITH THE ROUGH (OR WHAT IS NORMALLY REFERRED TO AS THE RESAWN FACE) FACE EXPOSED.
  • Page 19 B84DD Gable panel Pry the last horizontal bevel siding piece on the Bevel siding bottom of the gable panel slightly. Do not use too much force or the bevel siding will break. Wall panel Gable panel Slide in the skirting, behind the bevel siding as shown on diagram B Skirting Wall panel...
  • Page 20 B84DD There are three pieces of soffit to be attached on the low wide side of the shed. Using 2 - 1 " nails for each end of the soffit and 1 - 1 " nail for the center of each soffit attach the soffit to the underside of the rafter ends. For details refer to Figure S20 below. 2 pieces of x 4 x 37"...
  • Page 21 B84DD Install all Exterior Trim, Corner Boards, Top and Bottom Skirting, Cedarshed Plaque, Soffit Boards, Fascia etc. with 1-3/4" finish nails at 12" centers (FIGURE 17 and FIGURE 18). 1/2 x 4 x 45" Top Skirting P-G-G445 1/2 x 4 x 45"...
  • Page 22 Gable Fascia P-1455Yg 1 x 3¼ x 79¼" Corner Trim P-13C79C 1 x 4 x 24" Fascia P-1424 'Cedarshed' Plaque on Fascia 1 x 2 x 89½" H-PLAQL Trim P-1289G 1 x 3¼ x 79¼" 1 x 2 x 80½"...
  • Page 23 B84DD Pre-drill the holes before mounting the handles and hasp using " drill bit. Handle H-DHAND Hasp H-HASP (Not exactly as shown) OUTSIDE VIEW FIGURE S22...
  • Page 24 B84DD • Attach plaque with finishing nails. Rectangle shape plaques is attached to front fascia. See Figure S24. Cedarshed 2 - finishing plaque nails H-PLAQL Front fascia FIGURE S24...
  • Page 25 CONGRATULATIONS You have just successfully completed the construction of your Cedarshed Building. Thank you for choosing a Cedarshed Product. We hope that your entire experience was a rewarding one and that you will have years of enjoyment with our product.