Phase Bridge Diode Checking Method - LG MULTI V M ARNU07GTU 4 Series Svc Manual

Table of Contents

Advertisement

2.4 Phase Bridge Diode Checking Method

Internal circuit diagram
R
S
1. Wait until Comp PCB DC voltage gets discharged, after the main power switch off.
2. Pull out DC_Link connector connected with Inverter PCB.
3. Set multi tester in diode mode.
4. Measured value should be 0.4~0.7V measuring as below table.
5. In case the measured value is different from the table, set multi tester to resistance mode and measure. If the
value is small (0 Ω) or high (hundreds M Ω), PCB needs to be replaced.
Diode terminal
Tester terminal
R(~) : red(+)
S(~) : red(+)
T(~) : red(+)
R(~) : black(-)
S(~) : black(-)
T(~) : black(-)
] Red(+) and black(-) are the measuring terminals of multi tester.
CAUTION
• Check the electric parts of c/box, 10 minutes after switching off the main supply and checking DC
voltage is discharged. Otherwise, there is chance of getting electric shock.
• There is chance of electric shock by charged voltage.
T
+ terminal: black(-)
0.4 V ~ 0.7 V
0.4 V ~ 0.7 V
0.4 V ~ 0.7 V
-
-
-
Checking Method for Key Components
Appearance
- terminal: red(+)
-
-
-
0.4 V ~ 0.7 V
0.4 V ~ 0.7 V
0.4 V ~ 0.7 V
- 45 -
Copyright © 2018 LG Electronics Inc. All rights reserved.
Only training and service purposes.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MULTI V M ARNU07GTU 4 Series and is the answer not in the manual?

This manual is also suitable for:

Multi v m arnu09gtu 4 seriesMulti v m arnu12gtu 4 seriesMulti v m arnu18gtt 4 seriesMulti v m arnu24gtt 4 seriesMulti v m arnu05gtr 4 seriesMulti v m arnu07gtr 4 series ... Show all

Table of Contents