Section 2 - Ventilation; Details - Zenith HydroTap C125 Installation Instructions Manual

Filtered chilled drinking water for commercial kitchens and tea rooms.
Hide thumbs Also See for HydroTap C125:
Table of Contents

Advertisement

When installing air flow ducts, the following tools will be required:
• Jigsaw and 12mm drill.
• Keyhole or Wall Board saw.
Recommended Installation showing the correct air flow
MIN.
35mm
Warm Air OUT
via kickboard louvre
2.1
All Models
Proper air circulation must be provided for all Chilled models. The system will operate correctly only if the
recommended air gaps are achieved during Installation. It is recommended to install vent duct and louvre
panels for under floor and /or door vent systems.
**Note: Inlet and outlet vents should be separated by a Min 100mm, to avoid hot air recirculation.
IMPORTANT: See page 13 for clearances.
Page 14 of 20
Section 2
Ventilation
**MIN.
100mm
801525NZ - Chilled HydroTap Installation Instructions - Aug 2015 - v2.00
Cool Air IN
via cabinet
floor, front
vent grille

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hydrotap c175

Table of Contents