Summary of Contents for Ip.Access nanoLTE E61

  • Page 1 E61 AP Hardware Installation NANO_INST_43325 205_0.6...
  • Page 2 (a) the quality of third-party products or services; or (b) fulfilling any of the terms of the agreement with the third party, including delivery of products or services and warranty obligations related to purchased products or services.
  • Page 3 Revision History Version Change Summary Date Author 205_0.1 First draft 12 Mar 2019 205_0.2 Update regulatory information from review feedback 14 Mar 2019 205_0.3 Update electrical safety information from review feedback 18 Mar 2019 205_0.4 Corrections from review feedback 19 Mar 2019 205_0.5 Add PSU option 22 Mar 2019...
  • Page 4: Table Of Contents

    General Site Installation Requirements..............3 2.3.2 AP Cooling ......................4 2.3.3 Port Usage ......................4 2.3.4 nanoLTE E61 AP Power Requirements ............... 7 2.3.5 E61 AP Physical Requirements ................9 2.3.6 Thermal Protection ..................... 10 2.3.7 Backhaul (IP) Bandwidth Requirements............. 10 2.3.8...
  • Page 5 5.3.1 E61 AP Factory Reset..................30 AP and PSU Regulatory Information ..........31 Warnings and Cautions - nanoLTE E61 AP............. 31 Warnings and Cautions - Optional Power Supply Unit ........33 Regulatory Statements for the E61 AP ............34 6.3.1 US FCC Compliance ..................
  • Page 6: Introduction

    Introduction The nanoLTE E61 AP from ip.access is a compact Small Cell that provides LTE TDD capability. The E61 AP is targeted at indoor enterprise applications. This manual provides important information on installing the E61 AP hardware. Overview This manual is organised as follows: •...
  • Page 7: Installation Overview And Requirements

    • 2.2 Mounting Options • 2.3 nanoLTE E61 AP Site Requirements Installation Tasks The tasks that must be completed to install a nanoLTE E61 AP and make it ready to provide service are: • Pre-Provisioning in the NOS • Commissioning •...
  • Page 8: Mounting Options

    If possible, the engineer should stay on site until the AP is brought into service, ready to make test calls to verify the AP has been configured correctly from the NOS. nanoLTE E61 AP Hardware Installation Installation Overview and Requirements NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 3...
  • Page 9: Ap Cooling

    Factory Reset The AP may continue to use some of these ports outside the IPsec tunnel. For example, for contacting NTP servers. nanoLTE E61 AP Hardware Installation Installation Overview and Requirements NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 4...
  • Page 10 Mirror server functionality, the AP will also need to use this port outside of the IPsec tunnel: Protocol Destination Port HTTPS for CRL download from the NOS nanoLTE E61 AP Hardware Installation Installation Overview and Requirements NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 5...
  • Page 11 This assumes the AP is on a secure network that does not need IPsec. For example, a self-contained test network. nanoLTE E61 AP Hardware Installation Installation Overview and Requirements NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 6...
  • Page 12: Nanolte E61 Ap Power Requirements

    PSU, part number PSAA30R-050(MOT), is available for deployments where the ambient temperature is above 40°C. If there is a requirement to obtain the alternative PSU, contact an ip.access representative. nanoLTE E61 AP Hardware Installation Installation Overview and Requirements NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 7...
  • Page 13 AP. Therefore, the maximum cable run from the network switch to the AP is 100m, regardless of the placement of the PoE+ injector. The PoE+ injector supplied by ip.access complies with LPS requirements in accordance with IEC/EN 60950-1.
  • Page 14: E61 Ap Physical Requirements

    Operating Temperature 0°C to +45°C - wall mounted 0°C to +35°C - ceiling mounted Operating Humidity 10 to 70% non-condensing nanoLTE E61 AP Hardware Installation Installation Overview and Requirements NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 9...
  • Page 15: Thermal Protection

    It may be necessary to source alternative fixings if they are not suitable for the type of wall material on site. nanoLTE E61 AP Hardware Installation Installation Overview and Requirements NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 10...
  • Page 16: Nanolte E61 Ap Commissioning

    LTE AP requires is a connection to the Internet so that it can connect to the Redirector. No other commissioning activities are possible. This is the easiest way to commission an nanoLTE E61 AP. In this case, proceed to the hardware installation procedure in section 4.
  • Page 17: Requirements For Commissioning With The Web Page

    For connecting to the LTE AP from the commissioning terminal: • User name and password for the LTE AP’s web server - if necessary, contact customer support at ip.access for the current user name and password For commissioning the LTE AP: •...
  • Page 18: Other Items For Commissioning

    The items in this section can only be used if the commissioning terminal is running a web server that provides a path to any ip.access AP software download packages. That is, the required .sdp files must be present on the commissioning terminal.
  • Page 19: Redirector First Contact And Ntp Synchronisation For Software Update

    "last known time". The AP is now ready for commissioning and will accept code signed software downloads via the commissioning web page. nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Commissioning NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 14...
  • Page 20: Configure A Commissioning Terminal

    There is no default gateway, so ensure the default gateway address is cleared. Click OK to close and save the changes in each of the two dialogues. Also close the Control Panel. nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Commissioning NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 15...
  • Page 21: Access The Commissioning Web Page For The Lte Ap

    A login screen should appear in the browser. If the login screen does not appear immediately, refresh the browser screen once every 20 seconds until it appears. nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Commissioning NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 16...
  • Page 22: Optional - Software Download

    NOS Server. This can only be done if the commissioning terminal is running a web server that provides a path to any ip.access AP software download packages. That is, the required .sdp files must be present on the commissioning terminal.
  • Page 23 This ensures the LTE AP does not have old software on the standby bank. Hence, if the LTE AP is commanded to switch banks, it will run up-to-date software. nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Commissioning NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 18...
  • Page 24: Configure The Connection To The Nos Server

    If the IPsec connection is towards an ACME SeGW the Traffic Selector IP Addresses and Subnet Masks must all be left as 0.0.0.0. nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Commissioning NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 19...
  • Page 25: Configure The Tr-069 Management Connection

    AP with a factory reset. See section 5.3 for factory reset instructions. nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Commissioning NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 20...
  • Page 26: Commissioning Complete

    LTE AP has connected to the NOS and has also updated its configuration. After verifying this, re-pack the AP so that it is ready for delivery to its intended site. nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Commissioning NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 21...
  • Page 27: Nanolte E61 Ap Hardware Installation

    Check that the items have not been damaged in transit. For any damaged units, contact the supplier immediately for returns advice. nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Hardware Installation NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 22...
  • Page 28: Cable Connections

    (as supplied) and a standard CAT5 Ethernet cable or with a single Ethernet cable carrying PoE+. Two power supply modules are available from ip.access, designed for use with the ip.access E61 AP, that are compliant with the IEEE 802.3at standard: •...
  • Page 29: Optional Poe+ Injectors

    GPS antenna or an equivalent source such as a distributed GPS system. nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Hardware Installation NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 24...
  • Page 30: Mount The E61 Ap On A Wall Or Ceiling

    150mm from the side of the bracket to any side walls, as illustrated: For ceiling mounted APs, allow 150mm clearance on all sides: nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Hardware Installation NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 25...
  • Page 31 S62 AP onto the bracket and slide the AP until the retaining spring engages the indent at the rear of the unit. nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Hardware Installation NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 26...
  • Page 32: Troubleshooting

    The Ethernet port on the back of the E61 AP has a link activity LED that flashes when there is activity on the network connection. The LED is always off when the network cable is unplugged. nanoLTE E61 AP Hardware Installation Troubleshooting NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 27...
  • Page 33 The nanoLTE E61 AP has the following LEDs: Colour Description The S2D is not switched on. Green The LED may be Red or Green during the first 2 seconds after E61 AP powering up, while the is initializing. After this, Green Power indicates that the AP is powered up normally.
  • Page 34 This LED is Green when the AP has achieved GPS lock. The E61 AP has a GPS connector on the back panel for an external GPS antenna. nanoLTE E61 AP Hardware Installation Troubleshooting NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 29...
  • Page 35: Factory Reset

    • Factory configuration data that cannot be removed, which includes: • The AP’s Equipment ID (EID) • The FQDN for the ip.access NTP services hosted by ntp.org • The FQDN of the primary ip.access CRL mirror server 5.3.1 E61 AP Factory Reset Press and hold the Reset switch.
  • Page 36: Ap And Psu Regulatory Information

    This chapter provides the customer with safety and regulatory warnings, cautions and information for the ip.access Ltd range of products. • 6.1 Warnings and Cautions - nanoLTE E61 AP • 6.2 Warnings and Cautions - Optional Power Supply Unit • 6.3 Regulatory Statements for the E61 AP •...
  • Page 37 Do not install the AP in a position where any connected cables may be damaged by walking on the cables. nanoLTE E61 AP Hardware Installation AP and PSU Regulatory Information NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 32...
  • Page 38: Warnings And Cautions - Optional Power Supply Unit

    Do not install the power supply in a position where the cable may be damaged by walking on the cable. nanoLTE E61 AP Hardware Installation AP and PSU Regulatory Information NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 33...
  • Page 39: Regulatory Statements For The E61 Ap

    • Transport: Public Transport Class 2.3 - ETSI 300-019-1-2 • Operation: Partly Temperature controlled locations Class 3.2 - ETSI 300-019-1-3 nanoLTE E61 AP Hardware Installation AP and PSU Regulatory Information NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 34...
  • Page 40: Rf Exposure Statement

    (RF) Exposure Guidelines for base stations. This equipment should be installed and operated keeping the product 20cm or more away from a person's body. nanoLTE E61 AP Hardware Installation AP and PSU Regulatory Information NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 35...
  • Page 41: Regulatory Statements For Psu

    Non-operation -25 to +75C Humidity 20 to 90% DC Output Connector (Barrel Type) 2.1 x 5.5 x 9.5mm Center Positive Standard nanoLTE E61 AP Hardware Installation AP and PSU Regulatory Information NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 36...
  • Page 42: Output Specification

    6.4.1 Output Specification Model DC Output Load Ripple Regulation Efficiency Voltage P-P (max) Line / Load Level PSAA30R-120 2.50A 120mV nanoLTE E61 AP Hardware Installation AP and PSU Regulatory Information NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 37...