Smart Management Module (Smm); (50 Amp And 100 Amp Sold Separately); Application Considerations - Generac Power Systems PWRview RXEMW200A3 Owner's Manual

Automatic transfer switch
Table of Contents

Advertisement

Smart Management Module (SMM)

(50 amp and 100 amp sold separately)

Any loads, including central air conditioners, can be
managed using a Smart Management Module (SMM).
The system can accommodate up to eight individual
SMMs.
NOTE: SMMs are self-contained and have individual
built-in controllers.
Figure 2-3. Smart Management Module (SMM)
Automatic Transfer Switch Owner's Manual

Application Considerations

Generator overload condition is determined by generator
frequency. Loads are shed when frequency is less than
58 Hz for three seconds or less than 50 Hz for ½ second
(for 60 Hz systems).
The SACM can be used in conjunction with individual
SMMs to manage a combined total of eight loads.
Use Priorities A/C 1-4 on the SACM as the top
priorities, then up to four SMMs as Priorities 5-8.
Use only select A/C priorities on the SACM as the top
priorities, then use additional SMMs as the remaining
priorities.
A SMM can share a priority with an A/C priority on
the SACM provided the generator is sized to handle
the combined surge load from both appliances.
Sharing priorities can allow up to 12 loads to be
managed in a properly sized system.
In any combination of modules, the recovery times after a
loss of utility power or shutdown due to overload are
shown in
Table 1
000106
Priority
Recovery Time
1
2
5 minutes 15 seconds
3
5 minutes 30 seconds
4
5 minutes 45 seconds
5
6
6 minutes 15 seconds
7
6 minutes 30 seconds
8
6 minutes 45 seconds
Refer to the SMM Owner's/Installation Manual for
detailed characteristics and specifications of that product.
General Information
.
Table 1. Priority Settings
SACM
5 minutes
Yes
Yes
Yes
Yes
6 minutes
NA
NA
NA
NA
SMM
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
7

Advertisement

Table of Contents
loading

Table of Contents