Graf RainHarvest Systems Top-Tank 323002 Installation Instructions And Maintenance

Rainwater reservoir

Advertisement

Quick Links

Installation instructions and maintenance for the GRAF
GRAF Top-Tank
Order Nr.: 323002
The points described in these
instructions must be followed
correctly.
If
not
observed, any right to claim on
the guarantee may be refused.
For all additional Graf articles
purchased there are separate
installation
enclosed in the transportation
packing.
Any missing instructions must
be requested directly from us.
A complete check of all the
items/components for possible
damage must be carried out
before
the
assembly
installation begins.
The installation must be carried
out by a professional firm.
info@graf-online.de
www.graf-online.de
rainwater reservoir Top-Tank
Table of Contents
correctly
1.
1.1
1.2
2.
2.1
instructions
3.
3.1
3.2
4.
5.
5.1
5.2
6.
or
6.1
6.2
7.
GENERAL NOTES
Safety
Identification obligation
INSTALLATION SET UP REQUIREMENTS
Assembly above ground
TRANSPORT AND STORAGE
Transport
Storage
TECHNICAL DATA
ASSEMBLY
Trial installation
Tank assembly
ASSEMBLY ABOVE GROUND
Joining multiple vessels
Laying connections
SERVICE AND MAINTENANCE
page 1 of 4
2
2
2
2
2
2
2
2
3
3
3
3
4
4
4
4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RainHarvest Systems Top-Tank 323002 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Graf RainHarvest Systems Top-Tank 323002

  • Page 1 Installation instructions and maintenance for the GRAF rainwater reservoir Top-Tank GRAF Top-Tank Order Nr.: 323002 Table of Contents The points described in these instructions must be followed correctly. correctly GENERAL NOTES observed, any right to claim on Safety the guarantee may be refused.
  • Page 2 The tank cover has to be closed at all times, except when conducting works on the tank, otherwise there is a very high risk of accident. Only original GRAF covers or covers approved by the company GRAF in writing are to be used.
  • Page 3 Technical data Assembly Trial installation The container should be assembled on a trial basis before the final assembly to determine the position the following connections: • Inlet • Overflow After opening the connections it is important to remove and clean all the drilling and sawing swarf from the tank.
  • Page 4 GRAF SARL – 45, Route d´Ernolsheim – F-67120 Dachstein Gare – Tel.: 0033/388497310 – Fax: 0033/388493280 GRAF Iberica – C/Marquès de Caldes de Montbui, 114 baixos – ES-17003 Girona – Tel.: 0034/872032283 – Fax: 0034/872032284 GRAF Ltd – Maidstone, Kent – UK-ME16 8Ry – Phone: +44 (0) 16 22 68 65 50...

Table of Contents