MSA CH-105 Operating Manual
MSA CH-105 Operating Manual

MSA CH-105 Operating Manual

Automatic battery chargers

Advertisement

Quick Links

Limited Liability Company
«NPK MORSVYAZAVTOMATICA»
AUTOMATIC BATTERY CHARGERS
CH-105, CH-105-24
Operating manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CH-105 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for MSA CH-105

  • Page 1 Limited Liability Company «NPK MORSVYAZAVTOMATICA» AUTOMATIC BATTERY CHARGERS CH-105, CH-105-24 Operating manual...
  • Page 3: Table Of Contents

    Operating Manual Table of contents DESCRIPTION AND OPERATION OF THE PRODUCT ..........4 Description ..........................4 Main technical specifications ....................4 Structure and operation of the Product .................. 6 Measurement instruments, tools and appliances ..............12 Marking and sealing ......................12 Packaging ..........................
  • Page 4 This operating manual (hereinafter referred to as OM) is intended to describe the structure, operating principles, technical specifications and service of Automatic battery chargers CH-105 and CH-105-24 types (hereinafter referred to as – the Product, the CH). In addition to the instructions given in this document, the safety regulations and rules applicable in the field shall be observed.
  • Page 5: Description And Operation Of The Product

    Operating Manual 1 DESCRIPTION AND OPERATION OF THE PRODUCT ESCRIPTION The Product operates with AC single-phase mains 50 (60) Hz, volt- age 110; 220 V or 24 V DC and automatically charges SBs of shipborne equipment, communication systems and other industrial and transportation equipment. AIN TECHNICAL SPECIFICATIONS 1.2.1 The Product ensures: a) SB charge;...
  • Page 6 Automatic battery chargers CH-105, CH-105-24 Table 1 – General technical specifications of the Product’s types Value Parameter CH-105 CH-105-24 110 (99…121) – AC, frequency 50 (60) Hz 220 (198…242) Input voltage, V – 24 (19...36) Power consumption, W Max. output power, W 9…30...
  • Page 7: Structure And Operation Of The Product

    Operating Manual TRUCTURE AND OPERATION OF THE RODUCT 1.3.1 Functional elements, controls and LEDs The Product appearance is shown in Figure 1. Figure 1 – The Product appearance Display and control panel is located on the Product’s casing, see Figure 2. Figure 2 –...
  • Page 8 Automatic battery chargers CH-105, CH-105-24 For more information on the Product functional elements, controls, LCDs and LEDs, see Table 2. Table 2 – Functional elements, controls, LCDs and LEDs Type, size, identi- № Element Description fier Displays current charge (discharge) voltage and «Voltage, V»...
  • Page 9 (time of alarm operation until next check; check every 5 sec) Charge current exceeds set limits Reverse polarity power connection (only for CH-105-24) Note – «+» light or sound signaling. 1.3.2 Connection of peripheral devices 1.3.2.1 DTS-135 is installed on rechargeable SB and controls its current tem- perature.
  • Page 10 Automatic battery chargers CH-105, CH-105-24 BPC-136 is connected via standard RS-422 interface; it is connected to «Re- mote/Bat_control» charger terminal, see Figure 3. Forced connection of SB to load circuit is carried out by closing contacts of «Forced start key» terminal, see Figure 3.
  • Page 11 Operating Manual Figure 3 – The Product’s connection diagram 1.3.2.4 Load may have direct and switched connection to SB, see Figures 4–5, respectively. Direct type of connection is used for loads with consumption current more than 30 А, i.e., power exceeds maximum permissible for the Product. Switched connection is used for loads with max.
  • Page 12 Automatic battery chargers CH-105, CH-105-24 Figure 5 – Diagram of load to SB switched connection Do not use the Product with connected SB to power the load (i.e., in buffer mode), because the load connected to SB circuit may be limited in power output by the Product (e.g., in case of SC in SB circuit or in case of high drop in charge voltage in...
  • Page 13: Measurement Instruments, Tools And Appliances

    Operating Manual EASUREMENT INSTRUMENTS TOOLS AND APPLIANCES Consumables required for the TS are represented in Table 4. Table 4 – Consumables required for the TS Name and identifier Amount of Note of consumables consumables Cleaning cloth 0.10 kg To clean contamination from the surfaces Rectified hydrolytic 1 To remove severe contamination 0.01 l...
  • Page 14: Intended Use Of The Product

    Automatic battery chargers CH-105, CH-105-24 2 INTENDED USE OF THE PRODUCT 2.1 O PERATIONAL CONSTRAINTS Select an installation place in compliance with operational constraints (operating temperature and protection degree). It is prohibited to stretch cables connected to Product! Caution! Distance between the installation site and magnetic compass shall not be less than 1 m! 2.2 U...
  • Page 15: Usage Of The Product

    Operating Manual ‒ transfer a piano type switch on the Product’s casing to «ON» position. To switch The Product off: ‒ transfer a piano type switch on the Product’s casing to «Off» position; ‒ transfer circuit breakers of main power switchboard to «Off» position. 2.3 U SAGE OF THE PRODUCT 2.3.1 The Product operation modes...
  • Page 16 Automatic battery chargers CH-105, CH-105-24 Table 6 – Description of the Product operation depending on the selected operation mode and connection diagram Opera- Connection The Product status in case of power mains fail- Deep discharge tion type protection mode №...
  • Page 17 Operating Manual 2.3.2 Menu structure Menu of automatic chargers CH-105 and CH-105-24 has the following struc- ture, see Figure 7 and Table 7. Figure 7 – the Product’s menu structure Table 7 – Description of the Product’s menu items Menu item...
  • Page 18 Order of power phase connection is not essential; the Product will operate without malfunctions at any order. This type of protection is not supported by alarm and applied only to CH-105 type. 2.3.4 AU-106 (AU-206) or BPC-136 connection To ensure alarm signaling, use AU-106 (AU-206) or BPC-136; the units provide sound and visual signaling of no input power or transition to emergency operation mode.
  • Page 19 Operating Manual  press «SET. MUTE» to confirm the choice and record it in the non-volatile memory. 2.3.5.2 To set charge voltage, use built-in keyboard and provide the following steps:  Press and hold «SELECT» button on the casing until character «U» appears on the left LCD.
  • Page 20 Automatic battery chargers CH-105, CH-105-24 item «Pdd» and set «ON» status. If «OFF» status is selected, the function is switched off. SB deep discharge protection may be used only if load switched connection is used, see Figure 5. If direct connection is used, see Figure 4, protection function shall be switched off.
  • Page 21 Operating Manual age 12.0 V. If SB is placed far remotely from the Product, slightly increase charge val- ues in order to compensate loss due to power line length. Note – Given charge voltage values are optimal for the majority of shipborne SBs.
  • Page 22: Technical Service Of The Product

    Automatic battery chargers CH-105, CH-105-24 3 TECHNICAL SERVICE OF THE PRODUCT ENERAL DESCRIPTION The Product’s TS shall be provided by the staff acquainted with its composition, structure and operation features. In order to provide safe and reliable operation for the Product, the staff shall maintain all types of TS: –...
  • Page 23 Operating Manual Table 9 – № 1. Visual check of the Product Man-hours per To be done Routine 1 Product 1 check completeness and appearance of the Product; mechanical damage, paint defects must be absent; marking plates shall be present; legends are to be read easily.
  • Page 24 Automatic battery chargers CH-105, CH-105-24 RESERVATION The Product and set of operational documents are stored in preserved condition in Manufacturer’s packaging boxes. The time of represervation – 2 years from the Manufacturer’s commissioning. The represervation is done in heated rooms in the same order as the preserva- tion.
  • Page 25: Current Repair Of The Product

    Operating Manual 4 CURRENT REPAIR OF THE PRODUCT ENERAL DESCRIPTION The Product’s operability is controlled by piano type switch backlight glowing green. To diagnose the problem, see Table 13. If you cannot diagnose the problem, contact the Manufacturer’s service centre. AFETY FEATURES Any repair works must be provided by personnel examined and received proper qualifications in the area of the occupational safety.
  • Page 26 Automatic battery chargers CH-105, CH-105-24 Malfunction Possible reasons To be done The Product’s set charge voltage is lower than volt- Set relevant charge voltage (see 2.3.5.2) age level of connected SB SB is not recharging Switch the Product off. Remove the SB circuit rupture rupture.
  • Page 27: Storage

    Operating Manual 5 STORAGE The Product must be stored in packaging inside areas complying with the re- quired storage conditions (+ 5…+ 40 °С) with the concentration of dust, oil, moisture and aggressive impurities in the air within the required limits for the working areas of production facilities.
  • Page 28: Transportation

    Automatic battery chargers CH-105, CH-105-24 6 TRANSPORTATION The Product must be transported in the Manufacturer's transportation package in closed means of transport. Types of shipment: - motor vehicle and railroad transportation in closed means of transport (covered cars, multipurpose containers);...
  • Page 29: Disposal

    Operating Manual 7 DISPOSAL New equipment, the parts of the Product damaged during operation, and any overage equipment must not be disposed as standard household wastes, since they con- tain the materials suitable for re-use. Decommissioned and non-used components of the Product must be delivered to a special waste disposal center licensed by local authorities.
  • Page 30: Appendix А (Mandatory) Outline And Installation Dimensions

    Automatic battery chargers CH-105, CH-105-24 APPENDIX А (MANDATORY) OUTLINE AND INSTALLATION DIMENSIONS Figure А.1 – CH-105, CH-105-24 outline and installation dimensions...
  • Page 31: Units

    Operating Manual APPENDIX B (MANDATORY) DESCRIPTION AND PURPOSE OF PERIPHERAL UNITS B.1 R AU-106 EMOTE ALARM UNIT Figure В.1 – AU-106 outline and installation dimensions Description: Technical specifications:  rated input voltage: 24 V DC Ensures alarm signaling (light and sound sig- ...
  • Page 32 Automatic battery chargers CH-105, CH-105-24 B.2 R AU-206 EMOTE ALARM UNIT Figure В.2 AU-206 outline and installation dimensions Description: Technical specifications:  rated input voltage: 24 V DC Ensures alarm signaling (light and  max. power consumption: 3 W sound signals) ...
  • Page 33 Operating Manual B.3 A BPC-136 CCUMULATOR BATTERIES CONTROL PANEL Figure В.3 – BPC-136 outline and installation dimensions Description: Technical specifications:  rated input voltage: 24 V DC Ensures charger remote control; displays  power consumption: 3 W present values of charge (discharge) current ...
  • Page 34 Automatic battery chargers CH-105, CH-105-24 B.4 A BPC-136-01 CCUMULATOR BATTERIES CONTROL PANEL Figure В.4 – BPC-136-01 outline and installation dimensions Description: Technical specifications:  rated input voltage: 24 V DC Ensures charger remote control; displays  power consumption: 3 W present values of charge (discharge) current ...
  • Page 35 Operating Manual B.5 T DTS-135 EMPERATURE SENSOR Figure В.5 – DTS-135 outline and installation dimensions Description: Technical specifications:  input voltage: 3.0…5.5 V DC Measures current SB temperature and  max. power consumption: 0.1 W transmits received data by digital channel of «one-wire»...

This manual is also suitable for:

Ch-105-24

Table of Contents