Installation Of Lights - Vaderstad RAPID RDA S Series Instructions Manual

Seed drill
Hide thumbs Also See for RAPID RDA S Series:
Table of Contents

Advertisement

2.17.2
Hydraulics
Figure 2.19
Remove the three plugs (E), one from the top of the valve block and two from the rear at the points
marked 8 and 9. Remove the plugs carefully as there may be some residual hydraulic pressure. Fit
the cartridge valve (F), the solenoid (G). the hoses (H), the hose fittings and the ram (I).
See also the Spare Parts List.
Mount the Hirschman switch (J) marked WS1-15 D on the solenoid (G).
Test the pre-emergence bout marker function. When the drill is raised, the pre-emergence bout
marker must also always be lifted; when the drill is lowered, the pre-emergence bout marker must
also be lowered to enable tramlining (indicator lamp 6 lights on the Control Station).
NOTE!
When advancing the programme manually past tramlining, the pre-emergence bout mark-
ers may lower without the hydraulic control being used. In this case, raise the drill again.

2.18 Installation of lights

Figure 2.20
Install the light supports on the frame as shown in the figure.
Ver.2 01.11.2002
RDA 500-800 S
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rapid rda 500 sRapid rda 800 s

Table of Contents