INSTRUCTION FOR BURNERS MODEL
HINGED EXECUTION
• - The works on the burner and on the system have to be carried out only by competent people.
- Read carefully the instructions before starting the burner and service it.
- The system electric feeding must be disconnected before starting working on it.
- If the works are not carried out correctly it is possible to cause dangerous accidents.
en
BT 250 DSG
BT 300 DSG
BT 350 DSG
Edizione / Edition / Ediciòn
Cod. 0006080365
2001/05

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BT 180 DSG and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for baltur BT 180 DSG

  • Page 1 BT 250 DSG INSTRUCTION FOR BURNERS MODEL BT 300 DSG HINGED EXECUTION BT 350 DSG • - The works on the burner and on the system have to be carried out only by competent people. - Read carefully the instructions before starting the burner and service it. - The system electric feeding must be disconnected before starting working on it.
  • Page 2 Norme CE - CEI - UNI vigenti al momento della costruzione. • La BALTUR garantisce la certificazione “CE” sul prodotto solo se il bruciatore viene installato con la rampa gas “CE”...
  • Page 3: Table Of Contents

    INDEX PAGE Technical specifications ........................“ Conditions for good installation - Fastening the burner to the boiler - Fuel pipeline ....... “ Auxiliary pump - Description of operation .................... “ Control box specifications - First filling up of pipelines ................. “ Starting up and regulation ........................
  • Page 4: Technical Specifications

    BT 180 - 250 - 300 - 350 DSG N° 0002270350 WHIT HINGE REV. 11/10/95 CARATTERISTICHE TECNICHE / TECHNICAL SPECIFICATIONS TECNICAL DATA MODEL CARATTERISTICHE TECNICHE MODELLO BT 180 DSG BT 250 DSG BT 300 DSG BT 350 DSG FLOW RATE kg/h PORTATA kg/h BURNER OUTPUT...
  • Page 5 D E Ø F Ø BT 180 DSG 820 400 420 760 580 180 930 265 260 225 940 395 280 M16 275 BT 250 DSG 840 420 420 760 580 180 930 265 260 225 940 395 280 M16 275...
  • Page 6: Conditions For Good Installation - Fastening The Burner To The Boiler - Fuel Pipeline

    CONDITION FOR A GOOD INSTALLATION Before proceeding with installation, check that: The chimney (cross section and height) complies with the boiler manufacturer’s instructions and local standards. When it is necessary to make a refractory lining for the combustion chamber (if the type of boiler requires it), then it must be made according to the specific instructions of the boiler manufacturer.
  • Page 7 PIPES FOR LIGHT OIL BURNER MODEL BT 250 DSG GRAVITY SUPPLY SYSTEM 7 Return pipe 8 Automatic fuel interception 1 Tank device at burner shut off 2 Feeding pipe 9 Non-return valve 3 Wire-net filter 4 Pump 5 Degasifier 6 Suction pipe Total meters meters meters...
  • Page 8 PIPES FOR LIGHT OIL BURNER MODEL BT 300 - 350 DSG GRAVITY SUPPLY SYSTEM 1 Tank 7 Return pipe 2 Feeding pipe 8 Automatic fuel interception 3 Wire-net filter device at burner shut off 4 Pump 9 Non-return valve 5 Degasifier 6 Suction pipe Total meters meters...
  • Page 9: Auxiliary Pump - Description Of Operation

    ANCILLARY PUMP (see BT 8666/2) In some cases (excessive distance or difference in level) it is necessary to install a “loop-type” supply system with an ancillary pump, which dispenses with the connection of the burner pump directly to the tank. In this case the ancillary pump can be put into operation when the burner is started up and cut-off when the latter stops.
  • Page 10: Control Box Specifications - First Filling Up Of Pipelines

    CONTROL BOX SPECIFICATIONS Time between Control box Safety time Pre-ventilation Post-ignition 1st and 2nd flame & relatire in seconds & pre-washing time in seconds in seconds programmer time in seconds LAL 1.25 22,5 cyclic relay FIRST FILLING UP OF PIPELINES After having checked that the protective plastic caps inside the pump fittings have been removed, proceed as follows: Put the switch on the burner in the “0”...
  • Page 11: Starting Up And Regulation

    STARTING UP AND REGULATION (see Bt 8653/1 and BT 8608/3) Before starting up, make sure that: Connections to the supply line, to thermostats or pressure switches, have been made exactly according to the electrical diagram of the control box. There is fuel oil in the cistern and water in the boiler. All the gate valves fitted on the fuel oil suction and return pipelines are open as are any other fuel cut-off devices.
  • Page 12 CHECKS After starting up the burner, check the safety devices (photoresistant cell, shut down system, thermostats). The photoresistant cell is the flame control device and, if the flame should be extinguished during operations, it must be capable of intervening (this check should be made at least one minute after start up). The burner should be capable of blocking itself (shut down), and remaining so, when the flame does not appear regularly during the starting phase within the time limit pre-set on the control box.
  • Page 13: Using Of The Burner - Maintenance - Description Of Operation Of Two-Flame Burners

    USE OF THE BURNER The burner is a fully automatic burner; it is activated by closing the isolating switch and the control box switch; Burner operation is controlled by control and monitoring devices as stated in the chapter “Description of operation”. The “lock-out”...
  • Page 14: Hydraulic Diagram

    SCHEMA IDRAULICO DI PRINCIPIO ALIMENTAZIONE BT 8666/2 PER PIÙ’ BRUCIATORI DI GASOLIO OPPURE OLIO rev. COMBUSTIBILE CON VISCOSITÀ’ NOMINALE MASSIMA (5 °E A 50 °C) DIAGRAM OF PIPES OF FEED SYSTEM FOR ESQUEMA HIDRÁULICO PARA LA ALIMENTACIÓN LIGHT OIL BURNERS OR HEAVY OIL BURNERS WITH DE MÁS DE UN QUEMADOR DE GASÓLEO O DE PETRÓLEO MAXIMUMNOMINAL VISCOSITY (5 °E AT 50 °C) PESADO CON UNA VISCOSIDAD NOMINAL MÁXIMA DE 5°E 50°C...
  • Page 15: General Diagram Air Regulation

    GENERAL DIAGRAM AIR REGULATION N° 8608/3...
  • Page 16: Layout Diagram Of Nozzle - Electrodes - Disk

    INDICATIVE DIAGRAM SHIWING THE NOZZLE POSITION ELECTRODES - FLAME DISK AND REGULATION OF THE “D” N° 0002930070 HEAD-DISK DISTANCE IN HINGED LIGHT OIL TWO STAGES “DSG” BURNERS...
  • Page 17 PARTICOLARI BRUCIATORI N° BT 8605/1 BURNERS DETAILS 1 - Vite bloccaggio volantino Handwhell clamp screw 2 - Volantino di comando serranda aria. Regolazione aria per la 1° fiamma. Air damper control handweel. 1st flame air regula- tion. 3 - Dado di bloccaggio Lock nut 4 - Vite regolazione aria per la 2°...
  • Page 18: Details Of Pump

    POMPA BALTUR MODELLO BT..BALTUR PUMP MODEL BT..N° 0002900580 BOMBA BALTUR MODELO BT..
  • Page 19: Nozzle Flow-Rate Table

    TABELLA PORTATA UGELLI PER GASOLIO NOZZLE FLOW-RATE TABLE FOR LIGHT OIL TABLA CAUDAL BOQUILLAS PARA GASÓLEO Ugello Ugello Nozzle Nozzle Pressione pompa / Pump pressure / Presión bomba / Pression de la pompe / Druck Pumpe Boquilla Boquilla Gicleur Gicleur Düse Düse G.P.H.
  • Page 20: Air Regulation Servomotor Sqn 30.111 A3500

    8653-1 SQN 30.111 A3500 - PREVENTILAZIONE CON ARIA APERTA (POSIZIONE 2° FIAMMA) ARIA CHIUSA CON BRUCIATORE FERMO - PREVENTILATION WITH AIR OPEN (2nd FLAME POSITION) AIR CLOSED WITH BURNER IN STOP POSITION - PREBARRIDO CON AIRE ABIERTO (POSICION 2 LLAMA) AIRE CERRADO CON QUEMADOR PARADO 1 - CAMMA inserzione valvola 2°...
  • Page 21: Connectron Air Motor Lks 300 Regulation

    N° 8639 CONNECTRON AIR MOTOR LKS 300 REGULATION Rev. 10/05/00 To regulate please do as follows: A) open the thermostats’ circuit (disconnect the connection thermostats lcable) B) give voltage to the burner by closing the switches on the feeding line and the one on the burner. The control box must not, be in “lock position”, the control box fuse must be correctly at work and the cyclic relay must be stand in start position.
  • Page 22 8639 CONECTRON LKS 300 n° 2 di 2 Close air shutter cam with burner in stop position ST1 Air regulation cam 1° flame ST2 Air regulation cam 2nd flame MV2 2nd Flame valve connection cam (must be adjusted in a position between the 1st flame and the 2nd flame cam)
  • Page 27: Irregularity - Cause - Remedy

    INSTRUCTIONS FOR DETERMINING THE CAUSE LEADING TO IRREGULARITIES IN THE OPERATION OF LIGHT OIL BURNERS, AND THEIR ELIMINATION TYPE OF IRREGULARITY POSSIBLE CAUSE REMEDY 1) Clean or replace it The burner goes to lock-out with the 1) Photoresistance severed or fouled flame on (Red lamp on).
  • Page 28 Defective flame with sparks 1) Atomizing pressure too low 1) Re-set it at the required rating 2) Too much combustion air 2) Reduce combustion air flow 3) Inefficient nozzle, either fouled up 3) Clean it or replace it or worn out 4) Water in the fuel 4) Remove it from the tank using a suitable pump (never use the...
  • Page 29 Technical data in this brochure are given as information only. Baltur reserves the right to change specification, without notice. BALTUR S.p.A. Via Ferrarese 10 - 44042 CENTO (Ferrara) ITALIA Tel. 051.684.37.11 Fax 051.685.75.27/28 - (International Tel. ++39.051.684.37.11 - Fax ++39.051.683.06.86)