Navien NFB Series Installation & Operation Manual page 30

Table of Contents

Advertisement

Available languages

Available languages

3.5.2 System Application - Zone System with Zone Valves (Primary/Secondary Piping)
Return filter
Not to exceed 4 pipe Dia or Max. 12"
System application drawings are intended to explain the system piping concept only.
Note
Install a filter in the system return to remove foreign objects from the system. Foreign objects inside the system may result in
abnormal system operation.
Refer to "3.3 Filling the System" on page 27 for make-up water connections and refer to the requirements of your local codes
to ensure compliance.
Use a pump with an integral check valve or install a check valve at the pump outlet.
Refer to "3.6.5 Wiring Diagram - Zone Valve System" on page 39 for wiring connections.
30
Installing the System Piping
Additional Zone
Zone Valve
(Typical)
Air Separator
Boiler Pump
Zone #2
Zone #1
System Pump
Backflow preventer
Pressure reducing valve
Expansion Tank
Make-up Water

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Nfb-175Nfb-200

Table of Contents