Connecting The Condensate Drain - Navien NFB Series Installation & Operation Manual

Table of Contents

Advertisement

Available languages

Available languages

3.2 Connecting the Condensate Drain

The Navien NFB boiler creates condensation when it operates.
This condensation has an acidic pH of 3-5. Follow all local codes
and regulations when disposing of condensate from the boiler.
We recommend draining the condensate into a laundry tub,
as the alkali in laundry detergent will neutralize the acid in the
condensate. However, other suitable waste drain locations may be
used according to the local codes.
CAUTION
Do not cap or plug the integrated condensate line. If
prevented from draining, condensate can damage the boiler.
The condensate line must have a negative slope to drain
properly.
To attach the condensate trap to the boiler:
1. Check the components of the condensate trap.
2. Insert the condensate trap to the drain adapter at the bottom
of the boiler.
24
Installing the System Piping
3. Attach the clip to the condensate trap.
4. Ensure that the condensate trap is firmly fixed to the bottom
of the boiler.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Nfb-175Nfb-200

Table of Contents