Building In - Zanussi ZAF 42 Instruction Booklet

Zanussi instruction gas hob zaf 42
Table of Contents

Advertisement

Building In

Building over a cupboard or drawer
If the hob is to be installed above a cupboard or
drawer it will be necessary to fit a heat resistant board
below the base of the hob on the underside of the
work surface.
1
ON/OFF SWITCH
FLEX
OUTLET
FO 0763
Building over a kitchen unit with door
Proper arrangements must be taken in designing the
furniture unit, in order to avoid any contact with the
bottom of the hob which can be heated when it is
operated. The recommended solution is shown in
diagram 3.
The panel fitted under the hob ("a") should be easily
removable to allow easy access if technical assistance
is needed. The space behind the kitchen unit ("b") can
be used for connections.
Fitting the Hob into the worktop
Carry out the building in of the hob as follows:
• put the seals supplied with the hob, on the
edges of the cut out, taking care that the seals
meet without overlapping;
• place the hob in the cut out, taking care that it
is centred;
• fix the hob with the relevant fixing clamps
and screws, as shown in the diagram. When
the screws have been tightened, the excess
seal can be removed.
The edge of the hob forms a double seal which
prevents the ingress of liquids.
It is also recommended to carry out the electrical
connection to the hob as shown in diagrams 1 and 2.
2
ON/OFF SWITCH
FLEX
OUTLET
FO 0764
FO 0199
3
a
60
b
FO 1013
Dimensions are given in mm.
a
Seal
13

Advertisement

Table of Contents
loading

Table of Contents