Fig. 33 Electrodes
Check that the modulating combustion air/gas control linkages
are in good working order and that there is no play in the gas
control spindle.
Replace the burner trolley and bolt into position. Re-connect the
electrical connectors to the connection tray.
Re-commission the water heater as described in Section 6
commissioning.
Gas train
Fig. 34 Gas train
52
18IP22B