Installation - Pilz PNOZ s1 Operating Manual

Safety relays
Hide thumbs Also See for PNOZ s1:
Table of Contents

Advertisement

PNOZ s1

Installation

Install base unit without contact expansion module:
Ensure that the plug terminator is inserted at the side of the unit.
}
Connect base unit and PNOZsigma contact expansion module:
Remove the plug terminator at the side of the base unit and at the contact expansion
}
module.
Connect the base unit and the contact expansion module to the supplied connector be-
}
fore mounting the units to the DIN rail.
Installation in control cabinet
The safety relay should be installed in a control cabinet with a protection type of at least
}
IP54.
Use the notch on the rear of the unit to attach it to a DIN rail (35 mm).
}
When installed vertically: Secure the unit by using a fixing element (e.g. retaining brack-
}
et or end angle).
Push the device upwards or downwards before lifting it from the DIN rail.
}
Wiring
Please note:
Information given in the "Technical details" must be followed.
}
The outputs 13-14, 23-24 are safety contacts.
}
Semiconductor output Y32 should not be used for safety circuits!
}
To prevent contact welding, a fuse should be connected before the output contacts (see
}
technical details).
Calculation of the max. cable length l
}
I
max
R
lmax
R
l
Use copper wire that can withstand 60/75 °C.
}
Sufficient fuse protection must be provided on all output contacts with capacitive and in-
}
ductive loads.
Operating Manual PNOZ s1
21393-EN-07
R
lmax
=
R
/ km
l
= max. overall cable resistance (see technical details)
/ km = cable resistance/km
in the input circuit:
max
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

750101751101

Table of Contents