Download Print this page

Carbolite ABF 8/28 Installation, Operating, & Maintenance Instructions page 2

After burner ashing furnace

Advertisement

Parts Supplied
The following items should be present. These should all be checked and identified as soon as
possible after receipt of the equipment. The next page shows pictures of many of the parts for
identification purposes.
quantity
1
1
1
1
(1)
In addition, any spare parts ordered should be separately identified and put aside in safe storage.
2
S
UPPLIED
item
Afterburner Ashing Furnace: ABF 8/28
Chimney
Basket set
Basket set loading handle
Stand (only if ordered)
I
L
TEMS
IST
MF58 – 1.06

Advertisement

loading