2-3. Drying Sequence
1) Consist of drying sequence.
ex) select normal drying (Total spend time 4:08)
Drying time
(150min)
2) Electric Current Time of Dry Sequence.
Dry Option
Cup-Borad
Very
Iron
Low
Time
Air Refresh
Tub Clean
Wash & Dry
3) Drying V/V working
① It works from the after 20sec, 10 seconds On / 10 seconds Off operates drying cycle to the end.
② DRAIN PUMP operate 10 sec On / 30 sec off at the end of a cycle COOLING.
4) COOLING
① Fan motor and Main motor work at once during Cooling Sequence to low temperature.
② Temp. of Drum is less than 55°C or Cooling Sequence times is 20 min.
(for saftety, operate minimum 4min )
③ Cooling time is total 5 min. the operating time varies,depending on the actual conditions.
WFW0A1*,WFW0A2*,WFC0A2*(SM).indd 23
⇨
⇨
end (10sec)
Cycle Time (min)
150
200
60
110
30/60/120
35
30
40
Cooling & Crease
(not include time)
Heater OFF/ON
High voltage
90/80
90/80
90/80
70/60
70/60
80/70
70/60
90/80
23
low voltage
90/80
90/80
90/80
70/60
70/60
90/80
70/60
90/80
16. 5. 24. 오후 3:20