Download Print this page

Friedrich FPHMR18A3A Service And Parts Manual page 241

Multi-zone floating air pro
Hide thumbs Also See for FPHMR18A3A:

Advertisement

Appendix 2: Pipe Expanding Method
A:Cut the pip
Confirm the pipe length according to the distance of indoor unit and outdoor unit.
Cut the required pipe with pipe cutter.
B:Remove the burrs
Remove the burrs with shaper and prevent the burrs from getting into the pipe.
C:Put on suitable insulating pipe
D:Put on the union nut
Remove the union nut on the indoor connection pipe and outdoor valve; install
the union nut on the pipe.
E:Expand the port
Expand the port with expander.
"A" is di erent according to the diameter, please refer to the sheet below:
Outer diameter(inch)
1/4
3/8
1/2
5/8
F:Inspection
Check the quality of expanding port. If there is any blemish, expand the
port again according to the steps above.
241
APPENDIX
A(inch)
Max
Min
2/39
1/36
1/16
1/51
1/14
1/51
5/53
2/23
Pipe
Pipe cutter
Leaning
Uneven
Pipe
Shaper
Downwards
Union pipe
Pipe
Hard
mold
Expander
Pipe
Smooth surface
Improper expanding
leaning
damaged
surface
The length is equal
Burr
crack
uneven
thickness

Advertisement

loading