Assembly of the oar
Take an oar Coupler (C) and unscrew a few turns each of the two screw collars. Then take an
oar blade (A) and the shaft (B) inset into the coupler and tighten up the screw collars.
Repeat the same steps to assemble the other side of the oar. Please see below images:
A: Oar Blade
Deflating
•
For hull chambers, unscrew the Inflating Mouth by counter-clockwise to quickly
release the air. To empty the other air chambers, please pull the valve completely
out of the valve seat and take the stopper out of the valve extension as well.
Squeeze valve base to release air.
Attention: Due to temperature changes, valves can become rigid. To soften, soak
•
the closed valve in warm water for a few minutes.
C
A
B
Fix the mesh net as shown in the figure
C
B: Shaft
A
B
C: Coupler