Industrial Explosion -Proof Enclosures; Abs Plastic Commercial And Nema 4X Enclosures; Figure 9 - Sensor Element; Figure 10 - Sensor Element - Qel QTS-6100 Series Installation, Operation And Maintenance Manual

Analog transmitter/sensor
Table of Contents

Advertisement

8.2.1 I
E
NDUSTRIAL
XPLOSION
A) Remove cap and screen from sensor assembly.
B) Remove old sensor element, including O-ring seal.
C) Install new sensor element, including O-ring seal. Take care to align the pins to the socket.
D) Replace cap and screen on sensor assembly.
8.2.2 ABS P
C
LASTIC
OMMERCIAL AND
A) Remove four mounting screws located one at each corner of the front cover.
B) Securing the transmitter assembly from falling, remove the three transmitter mounting screws from the
front cover. Transmitter, sensor element, and grounding ring will all come free.
C) Remove old sensor element from transmitter pin sockets.
D) Install new sensor element into transmitter pin sockets. Take care to align the pins to the socket.
E) Remove O-ring from new sensor element.
F) Re-install sensor/transmitter against grounding ring on the inside front cover. Secure with three
mounting screws through the front cover.
G) Secure front cover with four cover screws, one on each corner.
B71050-021-000-RB.doc
JUL. 18, 2007
QTS-6000 Series
Analog Transmitter/Sensor
-P
E
ROOF
NCLOSURES
Figure 9 - Sensor Element Installation
NEMA 4X E
Figure 10 - Sensor Element Installation
ABS Plastic Commercial or NEMA 4X Enclosures
NCLOSURES
14
ELECTROCHEMICAL TRANSMITTER
PRODUCT MANUAL

Advertisement

Table of Contents
loading

Related Products for Qel QTS-6100 Series

Table of Contents