Huawei OceanStor Dorado2100 G2 Quick Installation Manual page 11

Table of Contents

Advertisement

Power On Devices
 Before you power on the system, ensure that you have connected the disk enclosures to the controller
enclosure.
 The power-on process takes about ten minutes. The disk enclosures start after the controller
enclosure is started.
 Check the status indicators after the devices are powered on.
 When the storage system is powered on, the colors of the indicators vary with the port speeds.
For details, see the OceanStor Dorado2100 G2 Storage System Installation Guide.
1
Switching On the External Power Sources
Switching on the external power sources of the devices in the following sequence:
Disk enclosures → controller enclosure → switch (for SAN) → application server.
2
Pressing the Power Button on Controller Enclosure
3
Checking the Status Indicators on the Controller Enclosure (Front View)
Power indicator of the
controller enclosure
Each controller enclosure has a hot spare disk, which resides in slot 24 (the rightmost slot on the front panel).
4
Checking the Status Indicators on the Disk Enclosure (Front View)
Power indicator of the
disk enclosure
Each disk enclosure has a hot spare disk, which resides in slot 24 (the rightmost slot on the front panel).
Disk running indicator
Green on
Disk running indicator
Green on
11
Green on
Green on

Advertisement

Table of Contents
loading

Table of Contents