Fabit E Series User Manual page 5

Pneumatic oil pumping machine
Table of Contents

Advertisement

44090E 44080E 42080E
Connecting wire
hose
Tighten
The nut
Guide
Sleeve
Guide lifting rod
Steel wire hose
G1/2inch thread
G1/2 Ball Valve
Figure A operation: link lift
rod assembly and the upper
body of the tank ball valve
As shown in figure A, the
wire
hose
on
corresponding
thread
G1/2
ball
valve
corresponding thread sealing
connection.
The following is the possible user selection of accessories:
ADD: Huli Industrial Zone, NO.4 Xinwei Industrial Estate, Gongming Office, Guangming District, Shenzhen , China.
TEL: 86 0755 61136563 FAX: 86 0755 27125016
SHENZHEN FABIT M&E EQUIPMENT CO. LTD.
Assembly method of oil connectors
G1/2 ball valve
Tank
Lock nut
Guide
sleeve
Figure
connecting the lifting rod
assembly and the tank guide
sleeve, as shown in figure B,
insert the guide rod into the
the
tank locking nut and the
and
guide sleeve, adjust to the
on
the
appropriate height, the fixed
lock ring.
Cup
Connection
Connecting
screw
Steel wire hose
B
operation:
E-mail:
fabit@vip.163.com
Pan
Connecting
screw
Figure C: connecting the
lifting rod assembly and a
drip pan as shown in figure C,
the pan is inserted into the
lifting rod assembly in place,
use a screwdriver to lock the
fixing screw, oil receiving
assembly is installed.
WEBSITE: http: //www.fabit.cn
5

Advertisement

Table of Contents
loading

Table of Contents