Download Print this page

Electrical Supply Connection - Cooper Lighting Fail-Safe VRVT3 Installation Instructions Manual

Led vaportight luminaire installation

Advertisement

Available languages

Available languages

Electrical Supply Connection

The VRVT3 is suitable for wet locations and approved for
the IP ratings shown above. Please follow the specific
instructions based on the IP ratings used for your particular
installation. Apply thread sealant to all fitting threads and
use a backup wrench when tightening any fitting to the hub.
Assemble the hub through the housing access hole with the
O-ring on the outside. Thread the hub locknut onto the hub
and tighten firmly. Do not allow the outside portion of the
hub and O-ring to rotate when tightening. (Figure 5 & 6.)
Hub O-Ring
Ip Hub (Supplied)
Ip Hub (Supplied) Sealant
Liquid-Tight Fitting
Liquid-Tight Conduit
With Seal
Figure 5.
Tighten Hub Locknut
Firmly Against Housing
Hub
Figure 6.
Installation Instructions – VRVT3 LED Vaportight Luminaire Installation
For general wet location installations and IP65, IP66, IP67
& IP69, use the supplied connector hub and install either a
suitably rated WT cord grip and cord, or liquid-tight conduit
and fittings.
For IP69 use only liquid-tight conduit & fittings. When
installing the hub, apply a small bead of silicone sealant
around the inner corner of the O-ring and hub body
before installing hub. Apply thread sealant to all threaded
connections and use a backup wrench on the hub when
tightening. IP69 cannot be achieved using any WT cord grip
fittings.(Figure 7 & 8.)
Figure 7.
Sealing Gasket
Figure 8.
COOPER LIGHTING SOLUTIONS
Hub O-Ring
Gland Nut
Sealing Ring
Grounding Ferrule
Body
IB519126EN
Installation instructions
Apply Bead Of Silicone
In Groove For Ip69 Only
3

Advertisement

loading