Download Print this page

Installation; Tools Required - Cooper Lighting Arbor Post Top Installation Instructions Manual

Advertisement

Available languages

Available languages

Installation Instructions – Arbor Post Top

INSTALLATION

This lighting fixture has been shipped complete with one
of several mounting options. Please follow the installation
instructions specific to the catalog part that you ordered.
N
otee:
Care must be taken not to set lighting fixture down
on optical lenses or lift the fixture in the lens area.

Tools required

Allen key 3/16" , #2 Phillips head screw driver and torque
wrench.
A. Post Mount Single Luminaire (3" O.D. Pole Top
Complete with 2-3/8" O.D. Tenon, Tenon Length Range
3" to 4" Only)
1.
Pull three leads from luminaire tenon fitter and supply
leads from the pole tenon.
2.
Connect supply wires to appropriate luminaire leads.
(Figure 1.)
Supply side ground wire to green luminaire lead.
Supply side neutral wire to white luminaire lead.
Supply side line voltage wire to black luminaire lead.
3.
Once connections are completely made, carefully push
all wires down into the tenon.
4.
Slip fit the fixture onto the tenon. (Figure 2.)
N
otee:
Make sure wires do not get pinched.
5.
For luminaire with asymmetric optics, rotate the fixture
according to arrow mark on the dome towards the
street side. (Figure 3.)
6.
Install six 3/8-24 x .375" set screws and tighten to
160 in-lbs. (Figure 4.)
7 .
Install six 3/8-24 x .1875" jam screws and tighten to
160 in-lbs. (Figure 4.)
CAUTION
Over tightening screws may cause fixture damage.
Neutral Wire
Line Voltage
Wire
Ground Wire
Figure 1.
2
COOPER LIGHTING SOLUTIONS
White
Black
Green
IB516001EN
Installation instructions
Tenon Fitter
2-3/8" Pole Tenon
Figure 2.
Street Side
Figure 3.
(6) Jam
Screws
Figure 4.
STREET SIDE
Arrow mark on
the dome
(6) Set
Screws

Advertisement

loading