Download Print this page

Verizon Networkfleet Asset Guard PW Installation Manual page 2

Advertisement

Getting Started
Asset Guard PW Overview
The Verizon Connect Networkfleet Asset Guard PW provides reliable tracking
for fixed and movable fleet assets such as trailers, containers/pods, generators,
heavy duty equipment, and more.
Registration & Activation Notes
Fill out the enclosed registration form for your records before starting physical
installation. Be sure to record the Asset Guard Unit serial number (MSN) along
with the label or serial number used to identify the piece of equipment being
managed.
Installation and Verification Notes
Select an installation location where Asset Guard PW can be mounted securely
and will not be damaged during normal use of the equipment.
Perform installation per the guidelines described in this document.
Call Verizon Connect Networkfleet Customer Care to verify successful
installation at 1-866-227-7323 opt. 5 (provided on the device registration card).
Hardware Mounting
Fill out the enclosed registration form for your records before starting physical
installation. Be sure to record the Asset Guard Unit serial number (MSN) along
with the label or serial number used to identify the piece of equipment being
managed.
1. Select a mounting location where the Asset Guard PW has a clear view
of the horizon and will not be damaged by normal operation of the
equipment.
2. Verify there is nothing that will be damaged on the back side of where you
intend to place the Asset Guard device by drilling holes.
3. Use the device mounting flanges as a template and mark the location
where each bolt will be inserted.
4. At each marked location, pre-drill the mounting holes.
5. Slide a flat washer onto each bolt then insert the bolts through the Asset
Guard PW mounting flanges. Make sure the flat washer is between the bolt
head and the plastic mounting flange.
6. Screw the self-locking nut onto the threads and tighten the assembly
using a 5/16" socket wrench on the bolt head and 3/8" socket wrench on
the nut. NOTE: If the asset to be managed creates substantial vibrations
during operation you should also apply blue thread locker to the neck of
the mounting bolts
2

Advertisement

loading