SHERCO 250 SE-R Workshop Manual page 43

Hide thumbs Also See for 250 SE-R:
Table of Contents

Advertisement

)
INJECTION SYSTEM INSTRUCTION MANUAL
SYNERJECT
• The following window will open. Click on
« Finish ».
The installation is complete
.
B- Connect the « MUXDIAG II » cable and its interface to a USB port on your computer
Connect the cable to the diagnostic connector of the motorcycle.
Make sure the « MUXDIAG II » unit is properly powered by checking the LED:
• Solid blue: PC connection properly established.
• Flashing blue: communication with PC in progress.
• Blue off: no connection to the PC, or device in standby; it can also indicate a problem with the USB connector.
• Solid green: firmware issue.
• Flashing green (slow): firmware correctly run.
• Flashing green (fast): communication with PC in progress.
• Green off: no firmware.
• Solid red: correct power supply to the card.
• All LEDs OFF: the outlet is not powered on, or is off or USB in on standby mode.
250/300 SE
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

250 se factory300 se-r300 se factory

Table of Contents