IOT Gateway
2/5
■ Installation Guide
1. Be sure to turn off power supply for outdoor unit prior to install the
IOT gateway.
2. Securely fasten the waterproof joint of the gateway to the reserved hole.
3. Plug the blue connector into CN11 (IOT) terminal on main control
board of outdoor unit.
Manufacturer reserves the right to change at any time for specifications or designs without notice and incurring obligations.
02.2018