Download Print this page

Lenovo ThinkSystem SE350 Manual page 7

Toolless friction rail v2
Hide thumbs Also See for ThinkSystem SE350:

Advertisement

Slide System into Rails in Rack (horizontal rack)
Step 1. Carefully lift the server and align the server to the slide rails. Position the server as shown and push the server
into the rack.
Step 2. Press the release latches.
Step 3. Push the server all the way into the rack until the server locks into place with a click.
Note: Use the same installation steps for the vertical rack.
Tighten Front Screws (optional)
Secure the server before you move the rack, or if you place the rack in a vibration-prone area. Open the rack release
latches and tighten the screws to firmly secure the rail.
1
Rack release latches
2
Front screw
7 7

Advertisement

loading

This manual is also suitable for:

7z467d1x7d277d1r