Download Print this page

OMNI mount PANA103PRO Installation And Assembly Instructions

Advertisement

Quick Links

INSTALLATION AND ASSEMBLY INSTRUCTIONS
ALL DIMENSIONS ‐ MM (INCH) 
MODEL : PANA103PRO 
MAX LOAD CAPACITY : 500 LB (227 KG) 
DOCUMENT NO : IA‐PANA103PRO_REV.A1 

Advertisement

loading

Summary of Contents for OMNI mount PANA103PRO

  • Page 1 INSTALLATION AND ASSEMBLY INSTRUCTIONS ALL DIMENSIONS ‐ MM (INCH)  MODEL : PANA103PRO  MAX LOAD CAPACITY : 500 LB (227 KG)  DOCUMENT NO : IA‐PANA103PRO_REV.A1 ...
  • Page 2: Parts List

    INSTALLATION AND ASSEMBLY INSTRUCTIONS ALL DIMENSIONS ‐ MM (INCH)  MODEL : PANA103PRO  MAX LOAD CAPACITY : 500 LB (227 KG)  NOTE : READ ENTIRE INSTRUCTION SHEET BEFORE YOU START INSTALLATION AND ASSEMBLY    WARNING    • Do not begin to install your Panasonic product until you have read and understand all instructions and  warnings contained in this Installation Sheet.  If you have any questions regarding any instructions  and/or warnings please call Panasonic Customer Support.  • This product should only be installed by a qualified professional.  • Make sure that the support surface will safely support the combined load of the equipment and all  attached hardware and components.  • Never exceed the Maximum Load Capacity of this mount : 500 lbs (227kg)  • Always use an assistant or mechanical lifting equipment to safely lift and position equipment  • Tighten screws firmly, but do not over tighten.  Over tightening can damage items, greatly reducing  their ability to hold.          PARTS LIST  Item  Description  Qty  Part #  A  BRACKET, WALL (RIGHT)  1  1100222‐08  B  BRACKET, WALL (LEFT)  1  1100222‐02 ...
  • Page 3 INSTALLATION AND ASSEMBLY INSTRUCTIONS ALL DIMENSIONS ‐ MM (INCH)  MODEL : PANA103PRO  MAX LOAD CAPACITY : 500 LB (227 KG)    INSTALLATION TO THE WALL    WARNING    • Installer must verify that the supporting surface will safely support four (4) times the combined weight  of all attached equipment (wall mount) and hardware along with panel.  • Mount is only meant for surface mounting to a wall.  For recessed mounting or any other mounting  please contact Omnimount Customer Service.        • Use ½” x 3 ½” Hex Head Lag Screws (H) and ½” Flat Washers (F) to attach Wall Brackets (A & B) to wall  in eight (8) places per Wall Bracket.      • Distance between inside edges of Wall Brackets must be 46" (1167mm) and Wall Brackets must be  level and square to one another.            CAUTION    • If Wall Brackets are not level and square, mount may not function properly.  • If using custom fasteners to attach Wall Brackets to wall be sure that fasteners can support the  combined weight of all attached equipment including wall mount and panel.     ...
  • Page 4 INSTALLATION AND ASSEMBLY INSTRUCTIONS ALL DIMENSIONS ‐ MM (INCH)  MODEL : PANA103PRO  MAX LOAD CAPACITY : 500 LB (227 KG)    • Remove spacers from rear of screen. Retain four (4) 16MM screws for installation of Panel Brackets.    • Secure Panel Brackets (C) to rear of screen by using the original 16MM screws along with four (4) Flat  Washers (I) and four (4) Locking Washers (J).        CAUTION    • Ensure that each fastener is tight and secure prior to preparing panel to lift and hang in position.                                          ...
  • Page 5 INSTALLATION AND ASSEMBLY INSTRUCTIONS ALL DIMENSIONS ‐ MM (INCH)  MODEL : PANA103PRO  MAX LOAD CAPACITY : 500 LB (227 KG)    WARNING    • Ensure that all adjustments are made with proper support of the panel at all times.  No adjustments  should be made unless done by a qualified installation professional.        TILT ADJUSTMENT    • Remove the lower bolt shown in Fig. 1 (Factory installation is set at 0° tilt)  • NOTE: Retain all hardware for installation after tilt position is selected.  • Select the proper hole based on the desired tilt requirement.  • Insert the bolt back into position ‐ ensure that the tube from the panel bracket has remained in the  wall bracket and has not moved from the installation position.  • Secure all hardware.     Fig. 1  DOCUMENT NO : IA‐PANA103PRO_REV.A1 ...
  • Page 6: Lateral Adjustment

    INSTALLATION AND ASSEMBLY INSTRUCTIONS ALL DIMENSIONS ‐ MM (INCH)  MODEL : PANA103PRO  MAX LOAD CAPACITY : 500 LB (227 KG)    LATERAL ADJUSTMENT    • Ensure that the panel is properly supported during lateral adjustment.  • Lift the panel per Panasonic lifting requirements to remove the load from the installed components.  • The panel may be shifted from side to side for final positioning and then set back into the retaining  slots of the wall bracket.    VERTICAL ADJUSTMENT    • NOTE : Vertical adjustment should only be done by a qualified installation professional.  • NOTE : Factory installation is preset to the lowest (bottom) position.  • Vertical adjustment is intended to support the final leveling process of the installation and should not  be used in any other installation manner.  • Locate the vertical adjustment fastener on top of each installation wall bracket as shown in Fig. 2  • The bolt may be used to either raise and/or lower the vertical position for each wall bracket as needed  to level.                     ...