Test Run - Toshiba Carrier MMY-MAP0726HT6P-UL Installation Manual

Multi type
Hide thumbs Also See for Carrier MMY-MAP0726HT6P-UL:
Table of Contents

Advertisement

10

Test run

CAUTION
• Turn on the power and turn on the case heater of
the compressor.
To save the compressor when it is activated, leave
the power on for more than 12 hours.
■ Methods of test run
◆ A test run is executed by using a
remote control
Operate the system normally to check the running
condition using the wired remote control. Follow the
instructions in the supplied owner's manual when
operating the unit.
If a wireless remote control is used for operations,
follow the instructions in the installation manual
supplied with the indoor unit.
To execute a test run forcibly under the condition that
the thermostat automatically turns the unit off due to
the indoor temperature, follow the procedure below.
The forcible test run will automatically stop after 60
minutes to prevent continuous forcible running and
return to normal running.
CAUTION
Do not use forcible running except for a test run as it
overloads the unit.
2, 4
TEMP.
ON / OFF
TIMER SET
TIME
FILTER
RESET TEST
SET CL
1, 5
1
Push and hold the
TEST
button for more than
4 seconds. TEST appears on the LCD and
the unit enters the TEST mode.
TEST
47-EN
2
ON / OFF
Push the
button.
3
Push the
MODE
button to switch the running
mode to COOL or HEAT.
NOTE
• Do not run the unit in any mode other than COOL or
HEAT.
• The temperature setting cannot be changed during
the test run.
• Check codes are detected as usual.
TEST
4
ON / OFF
Push the
button to stop running
after fi nishing the trial run.
The indication on the LCD display returns
to the status of procedure 1.
5
TEST
Push the
button to exit the test mode.
(TEST disappears on the LCD display and
the status changes to normal stopped
mode.)
3
◆ When a test run is executed by
using the interface P.C. board on
the outdoor unit
A test run can be executed by operating switches on
the interface P.C. board of the header outdoor unit.
"Individual test", which tests each indoor unit
separately, and "collective test", which tests all the
indoor units connected, are available.
<Individual test operation>
▼ Starting operation
1
Set the running mode to "COOL" or "HEAT"
on the remote control of the indoor unit to
be tested.
(The unit will run in the current mode unless
the mode is set otherwise.)
7-segment display
[A]
[B]
[U1]
[
]
2
Set the rotary switches on the interface P.C.
board of the header outdoor unit: SW01 to
[16], SW02 and SW03 to the address of the
indoor unit to be tested.
SW02
SW03
Indoor unit address
1 to 16
1
1 to 16 Set number of SW02
1 to 16
2
17 to 32 Set number of SW02 + 16
1 to 16
3
33 to 48 Set number of SW02 + 32
1 to 16
4
49 to 64 Set number of SW02 + 48
7-segment display
[A]
[B]
[
]
[
]
i
Address display of the
corresponding indoor unit
3
Push and hold SW04 for more than 10
seconds.
7-segment display
[A]
[B]
[
]
[
]
i
i
Address display of the
[FF] is displayed for 5
corresponding indoor unit
seconds.
– 24 –
NOTE
• The running mode follows the mode setting on the
remote control of the target indoor unit.
• The temperature setting cannot be changed during
the test run.
• Check codes are detected as usual.
• The unit does not perform test run for 3 minutes
after energized or terminating the operation.
▼ Finishing operation
1
Set the rotary switches on the interface P.C.
board of the header unit back: SW01 to [1],
SW02 to [1] and SW03 to [1].
7-segment display
[A]
[B]
[U1]
[
]
Collective test operation
▼ Start operation
1
Set the rotary switches on the interface P.C.
board of the header outdoor unit as below.
When in "COOL" mode: SW01=[2],
SW02=[5], SW03=[1].
When in "HEAT" mode: SW01=[2],
SW02=[6], SW03=[1].
7-segment display
[A]
[B]
[C
]
[
]
[H
]
[
]
EN
FR
48-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents