Download Print this page

IAC INDUSTRIES QS-SMS Assembly Instructions Manual page 4

Smart mobile station lower shelf

Advertisement

I
nstall 5/16-18 x .75 square head bolts (item D),
5/16 flat washer (item A), and 5/16-18 hex head
keps nuts (item E) to the top support brackets for
the shelf (items 2 and 3) as shown .
Do not tighten this hardware.
Make small pencil marks on the uprights
working height of the Worksurface and the Shelf.
Install the top support brackets by installing the
square head bolts into the milled slots in the front
nut channels of the upright. Gently slide the top
support brackets to the pencil marks and tighten
the hex head keps nuts to hold them in place. Do
not tighten this hardware to more than 10 foot lbs
of torque. Doing so will cause scoring to the
aluminum of the upright.
Place the Shelf (item 1) on the top support brackets so that the cut out fits around the upright. Line up the threaded inserts
in the bottom of the worksurface with the holes in the top supports and secure with the 1/4-20 x .625 phillips head screws
and flat washers.
4

Advertisement

loading

Related Products for IAC INDUSTRIES QS-SMS