Download Print this page

IAC INDUSTRIES QS-SMS Assembly Instructions Manual page 13

Smart mobile station lower shelf

Advertisement

QS-SMS CPU HOLDER
Installation
Remove the bottom pan
from the CPU Holder
Assembly and set aside.
attach the top portion to the
CPU UPR Brackets with four
1/4-20 x .625 screws.
Install 5/16-18 x .75 square head bolts (item
H), 5/16 flat washer (item C), and 5/16-18
hex head keps nuts (item D) to the CPU UPR
Bracket (item E).
Do not tighten this hardware.
Install two SMS CPU UPR Brackets to the
upright by placing the heads of the square
bolts into a milled cut out in the either side
of the upright (see below). Adjust to the
desired height and tighten the 5/16 nuts to
secure to the upright
4

Advertisement

loading

Related Products for IAC INDUSTRIES QS-SMS