Operation

The GrindLazer is designed to plane flat, horizontal con-
crete or asphalt slabs.
GrindLazer 270 (270 cc) and GrindLazer 390 (390 cc)
models are designed to be operated by a single
operator positioned at the back of the unit, or in
conjunction with LineDriver. GrindLazer 480 (480 cc)
and GrindLazer 630 (627 cc) can ONLY be operated
with LineDriver.
Maintain a safe operating distance from other people in
the work area. Avoid any pipes, columns, openings, or
any other objects protruding from work surface.
3A0101F
Start-Up
Before starting engine, perform the following:
Read and understand engine manual
Make sure all guards are in place and secure
Make sure all mechanical fasteners are secure
Inspect for damage to engine and other exterior
surfaces
Use correct cutters for each job. Make sure drum is
balanced and the correct number, size and type of
cutter wheels are being used. Make sure drum shaft
is locked and secured.
Inspect work area to locate any pipes, columns,
deck inserts, or other objects protruding from work
surface. Avoid these objects during operation.
Operation
5