Black Box ServCenter RF535A Manual
Black Box ServCenter RF535A Manual

Black Box ServCenter RF535A Manual

Rack and accessories

Advertisement

Quick Links

© Copyright 2003. Black Box Corporation. All rights reserved.
1000 Park Drive
Lawrence, PA 15055-1018
724-746-5500
Fax 724-746-0746

Advertisement

Table of Contents
loading

Summary of Contents for Black Box ServCenter RF535A

  • Page 1 © Copyright 2003. Black Box Corporation. All rights reserved. 1000 Park Drive • Lawrence, PA 15055-1018 • 724-746-5500 • Fax 724-746-0746...
  • Page 2 Order toll-free in the U.S.: Call 877-877-BBOX (outside U.S. call 724-746-5500) FREE technical support 24 hours a day, 7 days a week: Call 724-746-5500 or fax 724-746-0746 SUPPORT Mailing address: Black Box Corporation, 1000 Park Drive, Lawrence, PA 15055-1018 INFORMATION Web site: www.blackbox.com • E-mail: info@blackbox.com...
  • Page 4 TRADEMARKS USED IN THIS MANUAL TRADEMARKS USED IN THIS MANUAL Any trademarks mentioned in this manual are acknowledged to be the property of the trademark owners.
  • Page 5: Table Of Contents

    Calling Black Box ........
  • Page 6: Specifications

    CHAPTER 1: Specifications 1. Specifications Load Capacity: RF535A: Up to 2000 lb. (907.2 kg); RF537–RF538: 150 lb. (68 kg) Size: RF535A: 86"H (45U) x 30" to 36"D (218.4 x 76.2 to 91.4 cm); RF536: 3.5"H (2U) (8.9 cm); RF537: 17.5"H x 30"D (44.5 x 76.2 cm); RF538: 17.5"H x 36"D (44.5 x 91.4 cm);...
  • Page 7: Introduction

    SERVCENTER RACK AND ACCESSORIES 2. Introduction 2.1 ServCenter Rack (RF535A) The ServCenter Rack allows you to store servers and equipment conveniently and compactly. This sturdy 86" high (45U) rack is made of 12-gauge steel. It hold s up to 2000 lb. (907.2 kg) of equipment. The rack adjusts to fit 30"...
  • Page 8: Accessories

    CHAPTER 2: Introduction 2.2 Accessories A variety of accessories are available for the ServCenter Rack. They are described in Sections 2.2.1 through 2.2.4. 2.2.1 C (RF536) ASTER The Caster Kit contains four 3"D (7.6 cm) diameter locking casters that attach to the rack. Figure 2-2.
  • Page 9: Horizontal Cable Managers (Rf539 And Rf540)

    SERVCENTER RACK AND ACCESSORIES 2.2.3 H (RF539 RF540) ORIZONTAL ABLE ANAGERS The Horizontal Cable Manager (RF539) measures 19" (48.3 cm) wide and has 3"D (7.6 cm) diameter rings through which you can route cable. Figure 2-4. Horizontal Cable Manager. The Horizontal Mega Cable Manager (RF540) is also 19" wide, but it features 4"D (10.2 cm) diameter rings. Figure 2-5.
  • Page 10: Vertical Cable Managers (Rf541 And Rf542)

    CHAPTER 2: Introduction 2.2.4 V (RF541 RF542) ERTICAL ABLE ANAGERS Choose from two steel 67.8"H (172.2 cm) Vertical Cable Managers. The Vertical Mega Cable Manager (RF541) features cable rings that measure 4.4"W x 6"D (11.2 x 15.2 cm). It fits on the side panel of the ServCenter Rack. See Figure 2-6.
  • Page 11 SERVCENTER RACK AND ACCESSORIES The Two-Position Vertical Cable Manager (RF542) has cable rings that measure 2.1"W x 3.6"D (5.3 x 9.1 cm). Install it in the ServCenter Rack with the rings facing out or to the side. See Figure 2-7. Figure 2-7.
  • Page 12: Assembly

    CHAPTER 3: Assembly 3. Assembly 3.1 ServCenter Rack (RF535A) 1. Attach the legs to the inside of the rack leg channels using ⁄ -18 x 3⁄4" cap screws, ⁄ " flat washers, and ⁄ -18 hex nuts. See Figure 3-1. ⁄...
  • Page 13 SERVCENTER RACK AND ACCESSORIES 2. Attach the connecting strap at the same depth as the legs using ⁄ -18 x ⁄ " cap screws and hex nuts. ⁄ -18 x ⁄ " cap screws ⁄ -18 x ⁄ " hex nuts Figure 3-3.
  • Page 14: Caster Kit (Rf536)

    CHAPTER 3: Assembly 3.2 Caster Kit (RF536) Snap the casters into place on the bottom of the rack. See Figure 3-5. Figure 3-5. Installing the casters.
  • Page 15: Vented Shelves (Rf537 And Rf538)

    SERVCENTER RACK AND ACCESSORIES 3.3 Vented Shelves (RF537 and RF538) Using the 10-32 x ⁄ " screws and 10-32 cage nuts, attach the Vented Shelf to the rack. See Figures 3-6 and 3-7. 10-32 hex nut #10 washer 10-32 cage nut 10-32 x ⁄...
  • Page 16: Horizontal Cable Managers (Rf539 And Rf540)

    CHAPTER 3: Assembly 3.4 Horizontal Cable Managers (RF539 and RF540) Using the 10-32 cage nuts and screws, install the Horizontal Cable Manager into the rack. See Figure 3-8. Loosen the screws sufficiently to allow the Cable Manager to slide into position on the rack, then tighten the screws.
  • Page 17: Vertical Cable Managers (Rf541 And Rf542)

    SERVCENTER RACK AND ACCESSORIES 3.5 Vertical Cable Managers (RF541 and RF542) Using the ⁄ -20 x ⁄ " cap screws, ⁄ " flat washers, and ⁄ -20 hex nuts, attach the Vertical Cable Manager to the rack. See Figures 3-9 through 3-11. ⁄...
  • Page 18 CHAPTER 3: Assembly 10-32 cage nut 10-32 hex nut #10 washer Oriented for top mounting 10-32 x ⁄ " screw 10-32 x ⁄ " screw Oriented for bottom mounting Figure 3-10. Close-up view of a Vertical Cable Manager (RF541) installation. NOTE When mounting the Vertical Cable Manager to the front of the rack, install the cage nuts to the inside rails of the rack (see Figure 3-10).
  • Page 19 SERVCENTER RACK AND ACCESSORIES Incorrect: not flush Correct: flush with inside Figure 3-11. Installing the Cable Manager in the correct position. NOTE When mounting it to the front of the rack system, make sure that the cable manager is flush with the inside of the rack as shown in Figure 3-10. Otherwise, the cable manager will interfere with the mounted equipment.
  • Page 20: Troubleshooting

    • Package it carefully. We recommend that you use the original container. • If you are shipping the ServCenter Rack for repair, make sure you include everything that came in the original package. Before you ship, contact Black Box to get a Return Authorization (RA) number.

Table of Contents