INSTALLATION

1. Mounting surface should be flat and level.
2. The suction line should be kept as short as possible and present minimum friction loss.
3. Suction and discharge lines must be fully supported and installed so that no expansion or
shock forces act on the pump which could lead to a bad influence.
4. Ensure sufficient clearance around the motor and pump.

START UP

1. Before connecting the suction and discharge pipe work the entire system must be thoroughly
cleaned to prevent damage from welding, grinding and other residues.
2. Before starting, bump the motor to check if the motor fan is rotating clockwise or
counterclockwise when seen from the motor back. If the motor fan cannot be seen, look
through the pump case adaptor after takeoff motor shroud. (Bump means to momentarily
apply power to the motor and then immediately remove power).
3. Direction of rotating must only be checked with a completely filed system. Where double
mechanical shaft seals are installed the flush supply must be operational. Any dry running will
result in seal damage.
4. The motor rating plate should be checked to ensure that it is in accordance with the available
electrical supply. It is essential that the full load current is not exceeded to prevent motor
overload.
5. Before start up any safety guards required by local statutory regulations should be fitted.
Pay attention to circumstances that could indicate pump cavitation;
1. Low pressure in the suction line due to bad suction conditions.
2. Air in the suction-line.
3. Pumping temperature is too high.
4. Pump is oversized.
INSTALLATION