Integral Type Unit Assembly - JEC Pumps JRZS Series Operating & Maintenance Manual

Twin screw pumps
Table of Contents

Advertisement

INTEGRAL TYPE UNIT ASSEMBLY

If ZS series ordered by 'Integral type unit', they will be provided with pump head with integral
adaptor, Common base with adjustable leg, motor, motor cover and bracket. However, the contents
can be changed optionally.
Seated the assembled pump head and integral adaptor on the
Common base. Assemble the motor bracket on the Common
base.
Insert and assemble motor to the integral adaptor by
adjusting between the motor shaft key and key way in integral
stud shaft (192).
Assemble integral adaptor flange and motor by fastening bolt
(198) and nut (199).
Fasten socket set screw (197) inside of the hole by L-wrench.
Fit the motor cover at the integral adaptor flange and cover
bracket. Fasten motor cover with bolt each side on the
bracket.
Finally adjust the height and balance of the pumps by using
adjustable legs. Fasten the nuts (203) of all adjustable legs.
Fig. 29
Fig. 30
Fig. 31
Fig. 32
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jrzs100Jrzs200Jrzs300

Table of Contents