Page 1
WE-EF LEUCHTEN Installation and Maintenance Instructions Projector FLD111 #3 LED Do not open during installation Surge Protection This product is factory-sealed. This product features built-in surge protection circuitry in compliance with Refer to the instructions contained in this applicable standards.
Page 2
Projector FLD111 #3 IP66, Class I, ta = 40°C...
Light Source Maintenance Apart from cleaning the product’s exterior surfaces, no special maintenance work is required. Do not use high-pressure cleaners. In case of component failure due to abnormal circumstances or at end of life, replacement must be carried out by a suitably quali ed and trained professional.
Installation Installation Procedure The product must be installed and maintained by a 1) Switch off mains electrical supply. suitably quali ed professional in compliance with latest 2) Remove mounting ange A by loosening screws B. building/construction and/or electrical regulations and Detach terminal connector C.