Installation

Place the tower on suitable straight surface or pedestal. If needed or requested, fix it with
screws through holes in tower's legs.

Before first operation!!!

Because of filling and transportation there can be more dust in the tower. For first operation
use old downstream filter element (or, if system allow, without outlet pipe connection) to
remove the dust.