XR-L500/L500V/L500X
QQ
3 7 63 1515 0
Note: Follow the assembly procedure in the numerical order given.
3-1.
HOUSING
2 Install the hanger onto
two claws of the housing.
4 Fit claw on B part.
3 Put the housing
under A part.
housing
TE
L 13942296513
A part
3-2.
ARM (SUCTION)
projection
www
.
10
http://www.xiaoyu163.com
SECTION 3
ASSEMBLY OF MECHANISM DECK
5 Fit projection on C part.
C part
B part
x
ao
u163
y
i
http://www.xiaoyu163.com
2 9
8
7 Hold the hanger by bending the claw.
1 Install the catch to the hanger.
hanger
6 Fit projection on D part.
8 Hold the hanger by
bending the claw.
Q Q
3
6 7
1 3
1 5
2 Move the arm (suction) in the arrow
direction and fit on projection.
1 Fit the arm (suction) on the shaft.
co
.
9 4
2 8
D part
0 5
8
2 9
9 4
2 8
m
9 9
9 9