Drain Hole Position; Servicing Space Requirements - Midea M-thermal Split MHA-V4W/D2N8 Installation And Owner's Manual

Outdoor unit
Hide thumbs Also See for M-thermal Split MHA-V4W/D2N8:
Table of Contents

Advertisement

6.3 Drain hole position

This drain hole is covered by rubber
plug. If the small drain hole can not
meet the drainage requirements, the
big drain hole can be used at the same
time.
4/6 kW
It's necessary to install an electrical heating belt if water can't drain out in cold weather even the big drain hole has
opened.
It is suggested to site the unit with the base electric heater.
6.4 Installation space requirements
6.4.1 In case of stacked installation
1) In case obstacles exist in front of the outlet side.
≥500mm
A
Unit
4~10kW
It's necessary to install the water outlet connection pipe assembly if the unit is mounted on the top of each other,
preventing condensate flow to the heat exchanger.
6.4.2 In case of multiple-row installation (for roof top use, etc.)
1) In case of installing one unit per row.
Drain hole
Fig: 6-5
CAUTION
≥200mm
Fig: 6-6
A(mm)
≥2000
NOTE
10
Drain hole
8/10kW
2) In case obstacles exist in front of the air inlet.
≥500mm
≥20mm
≥300mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents