Eclipse BoostPak Install Manual

Eclipse BoostPak Install Manual

Leak detection option
Hide thumbs Also See for BoostPak:

Advertisement

Quick Links

630-LD Install Guide
7/30/2010
Eclipse BoostPak
Leak Detection Option
Version 3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BoostPak and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Eclipse BoostPak

  • Page 1 630-LD Install Guide 7/30/2010 Eclipse BoostPak Leak Detection Option Version 3...
  • Page 2: Disclaimer Notice

    Please send your corrections and comments to our Technical Documentation Specialist. Product Name Item # It must be understood that Eclipse’s liability for its product, DD MMM YYYY whether due to breach of warranty, negligence, strict liability, or otherwise is limited to the furnishing of...
  • Page 3 CGA and/or CE approvals where applicable. ■ Do not bypass any safety feature; fire or explosion could result. ■ Never try to operate a BoostPak if it shows signs of damage or malfunction. NOTICE ■ This manual provides information in the use of the BoostPak for its specific design purpose.
  • Page 4: Leak Detector Installation

    3-1/4" to shut down the BoostPak, or to turn on a ventilation fan. centers. Refer to the detailed instructions shipped with the leak detector The safety shut off valve is piped into the gas inlet inside the building and upstream of the BoostPak system.
  • Page 5: Electrical Installation

    • Position switches from the valve wire to control panel terminals 1021 (hot), 1041 (closed position), * Note, if the BoostPak system uses a High Inlet Gas and 1051 (open position). switch, the jumper is not present and the connection •...
  • Page 6: Operational Tests

    Customer Interface Test Response ___________ I certify this equipment is installed per the requirements of the manufacturer a nd that it is performing to its specifications. By: ____________________________ Date: ____________________________ Eclipse BoostPak Leak Detection Option, V3, Installation Guide 630-LD 7/30/2010...
  • Page 7: Leak Detector Operation

    (Alarm A), panel relay CR127 changes state. If the gas concentration reaches the second alarm level (Alarm B), panel relay CR128 changes state and the audible alarm comes on. Eclipse BoostPak Leak Detection Option, V3, Installation Guide 630-LD 7/30/2010...
  • Page 8: Maintenance And Troubleshooting

    Leak detector sensor bad Replace sensor. Wired incorrectly or wiring damaged Check repair wiring from annunciation panel to gas valve and detector module. Check and repair wiring from detector module to sensor. Eclipse BoostPak Leak Detection Option, V3, Installation Guide 630-LD 7/30/2010...
  • Page 9 Panel Layout, Enclosure and Terminal Strip Enclosure 14”H x 12”W x 6”D Panel 12.75”H x 10.88”W Eclipse BoostPak Leak Detection Option, V3, Installation Guide 630-LD 7/30/2010...
  • Page 10: Spare Parts List

    SEE PANEL LAYOUT DWG FOR TB1 TERMINAL STRIP LAYOUT. Spare Parts List Item Eclipse Part Number Number Description 10022887 Fuse, 10 amp 10013754 Fuse, 2 amp 22783 Relay, 4PDT 22793-1 Relay, DPDT Eclipse BoostPak Leak Detection Option, V3, Installation Guide 630-LD 7/30/2010...
  • Page 11: Conversion Factors

    Appendix Conversion Factors Metric to English From Multiply By actual cubic meter/h (am³/h) actual cubic foot/h (acfh) 35.31 normal cubic meter/h (Nm³/h) standard cubic foot /h (scfh) 38.04 degrees Celsius (°C) degrees Fahrenheit (°F) (°C x 9/5) + 32 kilogram (kg) pound (lb) 2.205 kilowatt (kW)
  • Page 12 Installation Manual 630-LD, 7/30/10...

Table of Contents