Eclipse BoostPak Installation Manual

Packaged gas booster system
Hide thumbs Also See for BoostPak:

Advertisement

Quick Links

630-2 Installation Guide
6/22/2010
Eclipse BoostPak
Packaged Gas Booster System
Model MS, MR and MH
Version 2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BoostPak and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Eclipse BoostPak

  • Page 1 630-2 Installation Guide 6/22/2010 Eclipse BoostPak Packaged Gas Booster System Model MS, MR and MH Version 2...
  • Page 2: Document Conventions

    Please send your corrections and comments to our Marketing Communications Manager. www.peconet.com It must be understood that Eclipse’s liability for its product, Product Name whether due to breach of warranty, negligence, strict Item #...
  • Page 3: Table Of Contents

    Heat Exchanger Motor Voltage .................... 17 Panel Layout and Enclosure ....................18 BoostPak Model MS/MR/MH Piping Schematics ..............19 Appendix ........................... i Conversion Factors ......................i Key to System Drawings ...................... ii Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 4: Introduction

    • Required to complete installation Related Documents • EFE 825 (Combustion Engineering Guide) • Eclipse Bulletins and Information Guides: 620, 710, Figure 1.1. Eclipse BoostPak 780, 904 (MH only), 925 (MH only), 940 Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 5: Safety

    CGA and/or CE approvals where applicable. Do not bypass any safety feature; fire or explosion could result. Never try to operate a BoostPak if it shows signs of damage or malfunction. NOTICE This manual provides information in the use of the BoostPak for its specific design purpose.
  • Page 6: Installation

    Installation Introduction around the BoostPak in order to facilitate servicing and field replacement of components. Avoid obstructing the In this chapter you will find information and instructions open access to the control panel. needed to install the BoostPak and system components.
  • Page 7: Electrical Installation

    If used, this optional switch may come already mounted electrical supply circuit ratings at the installation site to and wired on the BoostPak, or it may be supplied as a kit those on the nameplates of the BoostPak, control panel, to be remotely mounted.
  • Page 8: Checklist After Installation

    This switch may come already mounted and wired on the the correct location and confirm the proper settings. BoostPak, or it may be supplied as a kit to be remotely • Verify all device orientations are correct with respect mounted. This switch is required by local utility company to flow direction.
  • Page 9: Commissioning

    Commissioning Introduction Turn on the gas supply to the BoostPak and press the reset on the Inlet Low Gas Manual Reset Pressure In this chapter you will find information and procedures for Switch. the first operation and adjustment of the BoostPak.
  • Page 10: Commissioning Record For Models Ms/Mr/Mh

    Power Supply Voltage ______________ Booster Motor Current ______________ MR only: Position of Manual BV ______________ MH only: Heat Exchanger Motor Current ______________ Temperature Control Settings (Next Page) Rotary Actuator Settings (Next Page) Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 11: Mh Models Temperature Control Settings

    Parameters not listed here are set at default values found in Installation Guide 925. MH Models Rotary Actuator Settings PARAMETER CODE FACTORY _______________ _______________ _______________ (C6) _______________ (C0) _______________ Parameters not listed here are set at default values found in Installation Guide 904. Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 12: Operation

    Do not bypass any safety feature; fire or explosion the main disconnect switch off and turn off the main power could result. Never try to operate a BoostPak if it supply to the control panel. shows signs of damage or malfunction.
  • Page 13: Maintenance & Troubleshooting

    Inlet low gas manual reset pressure Check incoming gas pressure: adjust if switch has activated necessary. Check pressure switch setting and operation. If used, check that the pressure switch isolating valve is not closed. Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 14 Verify Parameters loop is providing insufficient cooling temperature controller settings incorrect Butterfly/actuator coupling loose; not Check and Reinstall. tracking Isolation valves not fully open (MH Open inlet/outlet isolation valves fully. only) Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 15: Boostpak Models Ms/Mr/Mh Wiring Diagram

    BoostPak models run interlock dry contact. using 3 phase power. Phantom component marked 8 is the optional customer alarm. Maximum current is 2 amps. Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 16 BoostPak Model MS, MR, and MH Wiring Diagram, Continued DETAIL “A” SINGLE PHASE INCOMING POWER WITHOUT THE UPS OPTION SINGLE PHASE CUSTOMER SUPPLY DETAIL “F” USED WHEN THE BOOSTPAK UNIT IS MOUNTED INSIDE AND THE BOOSTER MOTOR IS 1/2 OR 3/4 HP...
  • Page 17: Boost Motor Voltage

    460 VAC/3 PHASE/60 HZ Heat Exchanger Motor Voltage 230 VAC/1 PHASE/60 HZ 208 VAC/3 PHASE/60 HZ 230 VAC/3 PHASE/60 HZ 460 VAC/3 PHASE/60 HZ 115 VAC/1 PHASE/60HZ 208 VAC/1 PHASE/60 HZ Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 18: Panel Layout And Enclosure

    Panel Layout and Enclosure Innovative Thermal Solutions Eclipse Combustion Rockford, Illinois, U.S.A. www.eclipsenet.com Enclosure 16”H x 20”W x 8”D Internal View, Panel 13”H x 17”W Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 19: Boostpak Model Ms/Mr/Mh Piping Schematics

    BoostPak Model MS Piping Schematic Outlet Inlet BoostPak Model MR Piping Schematic Outlet Inlet BoostPak Model MH Piping Schematic Outlet Inlet Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 20: Appendix

    Appendix Conversion Factors Metric to English From Multiply By cubic meter (m³) cubic foot (ft³) 35.31 cubic meter/hr (m³/h) cubic foot/hr (cfh) 35.31 degrees Celsius (°C) degrees Fahrenheit (°F) (°C x 9/5) + 32 kilogram (kg) pound (lb) 2.205 kilowatt (kW) BTU/hr 3415 meter (m)
  • Page 21 Heat Exchanger Forced air to gas cooler removes excess heat that is generated in the booster. Thermocouple sensor measuring temperature. Flexible Connector Isolates booster from vibration, mechanical, and thermal stresses. Eclipse Packaged Gas BoostPak, V2, Installation Guide 630-2, 6/22/2010...
  • Page 22 Offered By: Power Equipment Company 2011 Williamsburg Road Richmond, Virginia 23231 Phone (804) 236-3800 (804) 236-3882 www.peconet.com...

Table of Contents