Electrical Installation; Specifications - Danfoss VLT MCB 115 Installation Manual

Table of Contents

Advertisement

Installation
Installation Guide | VLT® Programmable I/O MCB 115
Procedure
1. Remove the LCP and the LCP cradle.
2. Fit the option card into slot B.
3. Connect the control cables and relieve the cable. See

3.4.1 Specifications

for wiring details.
4. Fit the cradle on the drive.
5. Fit the LCP in the cradle.
2
3
1
4
Illustration 2:
Installation in Enclosure Sizes A5, B1, B2, B4, C, D, E, and F

3.4 Electrical Installation

3.4.1 Specifications
The VLT® Programmable I/O MCB 115 has 3 programmable inputs/outputs, which extend the number of inputs and outputs for the
drive.
10 | Danfoss A/S © 2020.01
AN295938195323en-000101 / 130R0655

Advertisement

Table of Contents
loading

Table of Contents